Default Tramlink works this weekend.

At a LURS meeting when Croydon Tramlink was being planned I remember
the speaker saying that with the method of construction being used the
rails could be quickly replaced when necessary by simply cutting out
the polymer they are embedded in; I think he said it could be done
with a high-pressure water jet.

Well, the time has come for the rails to be replaced on the very tight
curve at the junction of Wellesley Road and George Street, by Barclays
Bank. The trams started test running just about seven years ago; is
that the typical life of the rails on a curve as tight as this? I've
no idea, but they were quite worn. However, it's not just a matter of
cutting out the polymer, lifting out the new rails and dropping in the
new ones. Yeterday the real concrete blocks between the rails were
removed, and today the 'mock' blocks alongside the rails and the
concrete trackbed underneath were being dug out by two large hydraulic
concrete breakers. As of a couple of hours ago this part of the work
had not been completed. There were some portable lighting towers with
large metal halide lamps, so it looks like the work will continue
around the clock. Why was it necessary to do this, rather than just
replace the rails? I have seen what look like problems with the
trackbed in some places, but it looked quite sound here.

The trams are due to start running again on Tuesday morning; it took
much more than four days to construct the original trackbed and
install the rails; has a new method been developed that now enables
the work to be done in a much shorter time?

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Tramlink Censorship John Rowland London Transport 15 December 11th 05 09:48 AM
Tramlink at Wimbledon James Penton London Transport 4 April 23rd 05 01:43 AM
Tramlink engineering work. Clive R Robertson London Transport 0 August 9th 04 09:24 AM
Bus and Tramlink Pre-Pay Paul Corfield London Transport 8 May 12th 04 11:12 PM
Expensive Tramlink halt Alan \(in Brussels\) London Transport 2 August 12th 03 09:05 AM


All times are GMT. The time now is 11:42 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017