Matthew P Jones April 25th 07 06:42 PM

New Connection Watford Triangle - Metropolitan Line
 
I noticed today what appeared to be new connections from the fast lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ There is already such a connection
forming part of the existing junction.

Anyone know what is going on? Are the connections permanent, are they
re modelling the junction?


--
Matthew P Jones
www.ThisIsAmersham.com www.amersham.org.uk www.metroland.org.uk
Don't reply directly it will not be read. You can reply to knap AT Nildram then dot co then dot uk

[email protected] April 26th 07 08:20 AM

New Connection Watford Triangle - Metropolitan Line
 
On 25 Apr, 19:42, Matthew P Jones wrote:
There is already such a connection forming part of the existing junction.


This is the problem they're trying to fix. They're moving the
connection further south so that trains to Watford can run at higher
speeds round the curve.

U


TheOneKEA April 26th 07 09:50 AM

New Connection Watford Triangle - Metropolitan Line
 
On Apr 25, 7:42 pm, Matthew P Jones wrote:
I noticed today what appeared to be new connections from the fast lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ There is already such a connection
forming part of the existing junction.

Anyone know what is going on? Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.


chunky munky April 26th 07 05:20 PM

New Connection Watford Triangle - Metropolitan Line
 
On Apr 26, 10:50 am, TheOneKEA wrote:
On Apr 25, 7:42 pm, Matthew P Jones wrote:

I noticed today what appeared to be new connections from the fast lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ There is already such a connection
forming part of the existing junction.


Anyone know what is going on? Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.




The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.

Also the first site to be moved out of the Signal Cabins is Watford,
controlled by Rickmansworth Signal Cabin is May 2009 and Amersham to
close completely later in 2009.


Matt Wheeler April 26th 07 06:09 PM

New Connection Watford Triangle - Metropolitan Line
 

"chunky munky" wrote in message
ps.com...


The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


Interesting... the current PDF on the TFL site for the next 6 months
track closures makes no mention of any weekday closures on the met.
see
http://www.tfl.gov.uk/tfl/livetravel...k-closures.pdf





Adrian April 26th 07 08:34 PM

New Connection Watford Triangle - Metropolitan Line
 
Matt Wheeler ) gurgled happily, sounding much
like they were saying :

The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


Interesting... the current PDF on the TFL site for the next 6 months
track closures makes no mention of any weekday closures on the met.
see
http://www.tfl.gov.uk/tfl/livetravel...k-closures.pdf


Early shutdown, late start, I presume?

I dread to think how many TfL managers'll be dangling from trees if they DO
try and shut the line down on weekdays...

Not having trains for half of all weekends across nine months or so is
farcical enough...

asdf April 26th 07 10:44 PM

New Connection Watford Triangle - Metropolitan Line
 
On 26 Apr 2007 20:34:57 GMT, Adrian wrote:

The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


Interesting... the current PDF on the TFL site for the next 6 months
track closures makes no mention of any weekday closures on the met.
see
http://www.tfl.gov.uk/tfl/livetravel...k-closures.pdf


Early shutdown, late start, I presume?

I dread to think how many TfL managers'll be dangling from trees if they DO
try and shut the line down on weekdays...

Not having trains for half of all weekends across nine months or so is
farcical enough...


Especially after the Met shutdowns for the Wembley Park upgrade not so
long ago. What was that, every weekend for 12+ months?

Andy April 27th 07 11:26 PM

New Connection Watford Triangle - Metropolitan Line
 

"chunky munky" wrote in message
ps.com...
On Apr 26, 10:50 am, TheOneKEA wrote:
On Apr 25, 7:42 pm, Matthew P Jones wrote:

I noticed today what appeared to be new connections from the fast lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ There is already such a connection
forming part of the existing junction.


Anyone know what is going on? Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.




The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return to
lift the main pannels currently sitting aroung Croxley Tip and the triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is currently
sitting next to it)
17 August - Renew Watford East Junction (Croxley side)
24 August (Bank Holiday) - South Junction Prep works mainly point machine
fitting
31 August - Signalling commisioning
7 Sept + most Sept weekends track rewal on the curve between Croxley moor
park and removal exixitng junction.

Anyone wanting more details I could go on for pages
Andrew



burkey April 28th 07 05:53 AM

New Connection Watford Triangle - Metropolitan Line
 
On Apr 28, 12:26�am, "Andy" wrote:
"chunky munky" wrote in message

ps.com...





On Apr 26, 10:50 am, TheOneKEA wrote:
On Apr 25, 7:42 pm, Matthew P Jones wrote:


I noticed today what appeared to be new connections from the fast lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ *There is already such a connection
forming part of the existing junction.


Anyone know what is going on? *Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.


The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return to
lift the main pannels currently sitting aroung Croxley Tip and the triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is currently
sitting next to it)
17 August - Renew Watford East Junction (Croxley side)
24 August (Bank Holiday) - South Junction Prep works mainly point machine
fitting
31 August - Signalling commisioning
7 Sept + most Sept weekends track rewal on the curve between Croxley moor
park and removal exixitng junction.

Anyone wanting more details I could go on for pages
Andrew



Carry on, I'm interested!

John Burke
WRUG


www.waspies.net April 28th 07 08:59 AM

New Connection Watford Triangle - Metropolitan Line
 



I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return to
lift the main pannels currently sitting aroung Croxley Tip and the triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is currently
sitting next to it)
17 August - Renew Watford East Junction (Croxley side)
24 August (Bank Holiday) - South Junction Prep works mainly point machine
fitting
31 August - Signalling commisioning
7 Sept + most Sept weekends track rewal on the curve between Croxley moor
park and removal exixitng junction.

Anyone wanting more details I could go on for pages
Andrew


Thanks for the Info Andy, can you comment on the rumor that only 40% of
the scheduled work was completed during the massive easter shutdown?

Matthew P Jones April 28th 07 11:00 AM

New Connection Watford Triangle - Metropolitan Line
 
In reply to news post, which chunky munky
wrote on Thu, 26 Apr 2007 -
On Apr 26, 10:50 am, TheOneKEA wrote:

Also the first site to be moved out of the Signal Cabins is Watford,
controlled by Rickmansworth Signal Cabin is May 2009 and Amersham to
close completely later in 2009.


Where will the signalling centre be for the area / line? Are the cabins
to complete close meaning all the sidings and stabling points will be
controlled from a long distance away?
--
Matthew P Jones
www.ThisIsAmersham.com www.amersham.org.uk www.metroland.org.uk
Don't reply directly it will not be read. You can reply to knap AT Nildram then dot co then dot uk

chunky munky April 28th 07 11:18 AM

New Connection Watford Triangle - Metropolitan Line
 
On Apr 28, 12:00 pm, Matthew P Jones wrote:
In reply to news post, which chunky munky
wrote on Thu, 26 Apr 2007 -

On Apr 26, 10:50 am, TheOneKEA wrote:


Also the first site to be moved out of the Signal Cabins is Watford,
controlled by Rickmansworth Signal Cabin is May 2009 and Amersham to
close completely later in 2009.


Where will the signalling centre be for the area / line? Are the cabins
to complete close meaning all the sidings and stabling points will be
controlled from a long distance away?
--
Matthew P Joneswww.ThisIsAmersham.com www.amersham.org.uk www.metroland.org.uk
Don't reply directly it will not be read. You can reply to knap AT Nildram then dot co then dot uk




There will be an "interim" signalling centre/portakabins to replace
the Met Main Cabins (and possibly Hammersmith, even Edgware Road).
This is now expected to be at Neasden, but was going to be in a
central London TfL Office.

When the new SSR Service Control Centre is ready, everything will be
migrated accross. LU want to SSR Control Centre to be built in
Hammersmith (near the H&C station) but apparently the planning
application was turned down.


Andy April 28th 07 02:25 PM

New Connection Watford Triangle - Metropolitan Line
 

"www.waspies.net" wrote in message
...



I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return
to lift the main pannels currently sitting aroung Croxley Tip and the
triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is
currently sitting next to it)
17 August - Renew Watford East Junction (Croxley side)
24 August (Bank Holiday) - South Junction Prep works mainly point machine
fitting
31 August - Signalling commisioning
7 Sept + most Sept weekends track rewal on the curve between Croxley moor
park and removal exixitng junction.

Anyone wanting more details I could go on for pages
Andrew

Thanks for the Info Andy, can you comment on the rumor that only 40% of
the scheduled work was completed during the massive easter shutdown?


About 75% of the work was complete. From what I understand LUL were overly
worried about an overun especially with the RMT about to dig there heels in
so the job was descoped. The new south to south was complted and the start
of the north to north and most the related plain line. The July 7th was pre
booked for plain line renewal so both jobs will happen that weekend.
Andy



Andy April 28th 07 02:49 PM

New Connection Watford Triangle - Metropolitan Line
 

"burkey" wrote in message
oups.com...
On Apr 28, 12:26?am, "Andy" wrote:
"chunky munky" wrote in message

ps.com...





On Apr 26, 10:50 am, TheOneKEA wrote:
On Apr 25, 7:42 pm, Matthew P Jones wrote:


I noticed today what appeared to be new connections from the fast
lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ There is already such a connection
forming part of the existing junction.


Anyone know what is going on? Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.


The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return to
lift the main pannels currently sitting aroung Croxley Tip and the
triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is
currently
sitting next to it)
17 August - Renew Watford East Junction (Croxley side)
24 August (Bank Holiday) - South Junction Prep works mainly point machine
fitting
31 August - Signalling commisioning
7 Sept + most Sept weekends track rewal on the curve between Croxley moor
park and removal exixitng junction.

Anyone wanting more details I could go on for pages
Andrew



Carry on, I'm interested!

John Burke
WRUG


The junction is being moved to allow quicker is the speed on the through
routes. The speed of the curve between Croxley and Moor park will go up to
30 currently 20. It should be the first journey time reduction on SSL in a
long time. It will also remove the 30mph speed restriction in both
directions on the main between Ricky and Moor Park. One of the main reasons
for the project is the moveable angles (or switch diamonds) that form part
of the current south to south crossover. They are very unreliable and
expensive to maintain so this should be a win win sistuation.
It will all be tradional LUL signalling no Westinghouse computers yet. There
will visable signallling changes in the run to August with a couple of new
post for new juction signals and related repeaters.
One thing I did not mention is that the route between Rickmansworth and
Croxley will be closed 10 August to 3 September mainly to allow the
pre-building of the new East junction on the curve. I guess this will have
some effect on first/last trains.
Andy



burkey April 29th 07 08:21 PM

New Connection Watford Triangle - Metropolitan Line
 
On Apr 28, 12:26�am, "Andy" wrote:
"chunky munky" wrote in message

ps.com...





On Apr 26, 10:50 am, TheOneKEA wrote:
On Apr 25, 7:42 pm, Matthew P Jones wrote:


I noticed today what appeared to be new connections from the fast lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ *There is already such a connection
forming part of the existing junction.


Anyone know what is going on? *Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.


The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return to
lift the main pannels currently sitting aroung Croxley Tip and the triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is currently
sitting next to it)


Were these panels made up on site as they do appear to be very big to
have been craned in?

Burkey


Andy April 30th 07 10:27 PM

New Connection Watford Triangle - Metropolitan Line
 

"burkey" wrote in message
ups.com...
On Apr 28, 12:26?am, "Andy" wrote:
"chunky munky" wrote in message

ps.com...





On Apr 26, 10:50 am, TheOneKEA wrote:
On Apr 25, 7:42 pm, Matthew P Jones wrote:


I noticed today what appeared to be new connections from the fast
lines
to the slow lines just south of where the Met line splits into the
Watford and Rickmansworth routes/ There is already such a connection
forming part of the existing junction.


Anyone know what is going on? Are the connections permanent, are they
re modelling the junction?


The junction is being remodelled, mainly to remove the moveable angles
in the fast/slow convergence and to replace otherwise worn-out track
and pointwork.


The New (Southern) Watford South Junction, was started during the
Easter Shutdown.
It is scheduled to be commissioned during the Summer. Also I believe
(but dont have the dates to hand but they should be on the TfL
website) that there will be a number of weekday shutdowns Harrow/
Northwood-Amersham/Chesham/Watford and Marylebone-Great Missenden.


I know a little about this project a few dates for anyone intrested

7 July - Finish south junction track work - The Kirow crane will return to
lift the main pannels currently sitting aroung Croxley Tip and the
triangle
10 August - Renew Watford North Junction (closest to Ricky) (it is
currently
sitting next to it)


Were these panels made up on site as they do appear to be very big to
have been craned in?

Burkey

They were brought in by the Class 66 locos during one of the plain line
renewals.

The pannels for the east junction will be (re)made up on site. Its soon to
be under test at Balfours in Beeston.
Andy



Clive D. W. Feather May 8th 07 06:01 PM

New Connection Watford Triangle - Metropolitan Line
 
In article , Andy
writes
Anyone wanting more details I could go on for pages


Do you have the kilometrage for the new junctions?

--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:


All times are GMT. The time now is 05:04 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk