Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]() "Tom Anderson" wrote in message h.li... On Wed, 4 Jul 2007, Bob wrote: http://www.publications.parliament.u...70627h0006.htm Or, for those preferring a slicker interface with wee pictures of the interlocutors: http://www.theyworkforyou.com/whall/...7-06-27a.101.1 Martin Linton secured an adjournment debate on the 27th June 2007 about bringing forward the ELLX phase two extension to Clapham Junction. There were some interesting comments about taking over SLL services from Victoria to London Bridge into the Overground network, the need for connections to Finsbury Park, the dropping of the Wimbledon link Linton mentions an idea i hadn't heard before, of extending the ELL from CJ to Wimbledon via the Wimbledon branch of the District line. There's some capacity available there, clearly, but how do you get from CJ to East Putney? Doesn't that mean sharing tracks with Windsor line trains? Isn't that a terrible idea? I hadn't heard of this before, but there is a down line from the Windsor line to East Putney, still plainly visible trailing in on the left at East Putney station. Its still in use by SWT for depot access and diversions. Using it for a service to Wimbledon would probably require the Up flyover to be reinstated, but much of the viaduct is still there. Sharing with Windsor line trains is about as terrible as sharing with main line trains in the direction of Croydon and Crystal Palace? There are probably enough existing trains on the route to flle it under 'difficult but not impossible'... Paul |
Thread Tools | Search this Thread |
Display Modes | |
|
|