London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old October 10th 07, 10:41 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 49
Default Thameslink 2000 question


"MIG" wrote in message
oups.com...

Some peak trains are scheduled to stand for several minutes at
Blackfriars. Also, as someone said, it's travelling at walking pace
and generally waiting so long at every station that takes up the time.

I think this is a deliberate attempt to avoid transferring delays between
the northern and southern sections of the route, and to ensure that
southbound trains arrive at Borough Market Junction on time. When (if?) they
get round to giving Thameslink its own path through London Bridge it should
be possible to speed things up a bit.

D A Stocks


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Exciting news on Thameslink 2000 (now "Thameslink Project") [email protected] London Transport 5 May 5th 06 07:45 PM
Thameslink 2000 and other animals Dave Arquati London Transport 28 April 13th 05 09:27 AM
Thameslink 2000 Christine London Transport 10 September 10th 04 10:18 AM
THAMESLINK 2000 Christine London Transport 2 December 1st 03 08:24 PM
New Thameslink 2000 proposals? s c London Transport 0 October 22nd 03 01:57 PM


All times are GMT. The time now is 03:32 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017