Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]()
On 19 Dec, 21:47, "Paul Scott" wrote:
Is it to be an access for NR engineering trains delivering new track, ballast etc, off the NR lines? It'll be a while before access is available from the north of the route, and in any event, its the only practical way full length welded rail could be delivered. It wouldn't have to be built to the full standards of the finished article, just a through siding, if only to be used for limited activities during possessions. I'd think the connection to the outside world will be made at the south end of New Cross Gate, which will also [probably] be needed as a running line. The junction by Surrey Quays is just sidings and won't go anywhere until/if Phase 2 is built. U -- http://londonconnections.blogspot.com/ A blog about transport projects in London |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
East London Line closed this Sunday for resignalling work | London Transport | |||
Do out-of-London bus passes work on London bus touch-pads? | London Transport | |||
The East London Line is dead... Long live the East London Line | London Transport | |||
East London Line - what happens to the London Bridge services? | London Transport | |||
East London Line Progress | London Transport |