I have been jotting down from various sources the main project
milestones for the ELLX work and would like to (a) be able to expand the headings to a more detailed list and (b) mark them off as there are completed. Please feel free to ammend the list if you are better informed. March and May 2008 next year look interesting with no less than three bridge launches. We will be able to see the gradient of the new GE19 bridge as it climbs across the GEML - does anybody know if this will be steeper than the Blackfriars to City Thameslink ski ramp slope? We will also be able to see what looks like a very sharp curve linking the Bishopsgate Goods Yard and the Kingsland viaduct - will this become a neighbourhood nuisance as the wheels squeal 32 times an hour? June 2005: £35 million enabling works to rebuilding and refurbish the Kingsland viaduct including 21 bridges from Shoreditch High Street to Dalston. ( is this work now completed?) December 2007: Demolition of old Victorian GE19 bridge, formerly linking Bishopsgate Goods Depot to Spitalfields, that spans Liverpool Street Station approaches. March 2008: Launch new bridge at Shoreditch High Street. May 2008: Launch New Cross Gate flyover ( and I assume begin to open the southbound link by extending through platform 1 in order to access rail construction materials) May 2008: Launch new GE19 bridge in Spitalfields. December 2008: Deliver first new train for testing. June 2010: Northern extension complete, with new step-free stations at: · Shoreditch High Street built on the northern edge of the former GER Bishopsgate:Goods Depot ,located south of Bethnal Green Road, between Shoreditch High Street and Wheeler Street · Hoxton: located on the northeast corner of the junction of Cremer Street and Geffrye Street · Haggerston: located beside Acton Mews · Dalston:Junction built in a cutting on the site of the old Dalston Junction station to the south of Dalston Lane, between Kingsland Road and Roseberry Place The four platform station will include two through tracks to Highbury and Islington with a two centre reversing tracks. The site above the station will be developed as a mixed use development. June 2010: Southern extension complete to New Cross, Crystal Palace and West Croydon . February 2011: Further Northern extension from Dalston Junction to Highbury and Islington complete. Phase 2 - date not known but the project has been described by Network Rail in South London RUS as an enabler to the now authorised Thameslink upgrade. At the southern end, the 'western' extension will run from south of Surrey Quays to join the existing South London Line between South Bermondsey and Queen's Road Peckham. This will require new track to be constructed, partly on what was an East London Line freight train route connection.(How much is new, how much reused?) The new link will run at surface level along the western side of the Silwood Triangle, across Surrey Canal Road, where a new station will be provided, through the western edge of Bridge House Meadow, over the eastern end of Hornshay Street, rejoining existing Network Rail infrastructure at Wagner Street. In addition to Surrey Canal Road, the second phase service will call at all stations from Dalston Junction to Clapham Junction. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
East London Line closed this Sunday for resignalling work | London Transport | |||
Do out-of-London bus passes work on London bus touch-pads? | London Transport | |||
The East London Line is dead... Long live the East London Line | London Transport | |||
East London Line - what happens to the London Bridge services? | London Transport | |||
East London Line Progress | London Transport |