Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#12
|
|||
|
|||
Overcrowded trains
In message , at 12:09:45 on
Sun, 3 Aug 2008, Paul Scott remarked: As I've mentioned before, TOCs such as SWT use SDO by whole unit, sometimes only releasing the doors in 4 coaches of 12; or using single door only in 444s at 4 platform stations such as Beaulieu Rd, or Shawford. Do those trains have a corridor connection between each set of 4 carriages? One of the major design flaws in the networkers on the Cambridge line is that they don't. The 5-car train I mentioned earlier was made of three units (2+2+1) and not only was there a corridor all the way through, the connecting doors were open so you could see all the way through the train! -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
LU Overcrowded Terminal Capacity | London Transport |