London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old January 18th 09, 11:46 AM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2008
Posts: 19
Default Watford rail link support boost

Watford rail link support boost

From eWatford Observer
5:19pm Friday 16th January 2009

By Michael Pickard »


The extension of the Metropolitan tube line to Watford Junction
station moved a step closer to realisation today.
Two schemes developed by Hertfordshire County Council were backed by
the East of England regional Assembly's Regional Planning Panel, and
the assembly will now advise the Department of Transport to fund them
both.
It is hoped the plans - the £162 million Croxley Rail Link and the £38
million Watford Junction Interchange - will reduce congestion and
boost Watford's economy.
Stuart Pile, executive member for highways, transport and rural
affairs, said: “I’m delighted that the regional assembly will be
pushing the Government to fund these schemes. We need to invest in our
transport infrastructure if we’re going to support our economy and
reduce congestion.
“The Department for Transport bases its funding decisions on the
regional advice, so we’re optimistic that we’ll get the go-ahead and
that the line can open in 2017.”
The £162 million Croxley Rail Link scheme will see the Metropolitan
Line re-routed and extended to Watford Junction, where it will meet
Network Rail services.
Tube trains will run from Watford Junction to Central London every ten
minutes, the County Council said.
New stations would be also opened at Ascot Road and Watford West, with
improvements made to existing stations at Watford High Street and
Watford Junction.
The £38 million Watford Junction Station Interchange scheme involves a
major redevelopment of the station.
The station will get more drop-off points, easier pedestrian access
and better bus and coach facilities. New car parks will be built along
with a new link road.
………………………………...................................... ..............................
………………………………...................................... ..............................
John Burke
WRUG


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Boost for Tube extension plan as Wandsworth gets triple-A ratings John Salmon[_6_] London Transport 44 November 22nd 11 03:40 PM
Watford Junction plans get cash boost burkey[_2_] London Transport 0 July 3rd 09 12:48 PM
Boost your business with Quality Web & Design Services at BargainPrices! Sindy London Transport 0 January 23rd 08 01:53 PM
Tony Blair support for Crossrail [email protected] London Transport 7 November 17th 06 08:57 AM
Stop cross posting into alt.support.impotence JFGrieve London Transport 0 May 27th 06 10:24 AM


All times are GMT. The time now is 07:43 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017