Default Bakerloo to Watford Junction

After reading through some retro messages and thinking (happens once
in a while) I think I have come up with a reasonable(ish) plan for the
shocking service in place between harrow and wealdstone and watford
jn.
Get rid of the 313s- they will have uses elsewhere.
lower platform hights between watford jn and harrow and wealdstone and
between queens park-euston (elsewhere the hights are still kosher for
the tube stock)
Get some trains with floors the same hight as tube stock to run euston
- watford metro services.
Get some tube stock that uses the same power methods as the metro does
(i.e. only using 3rd rail between queens park-harrow and wealdstone)
this will mean that the 4th rail doesn't have to be fixed between
harrow and watford.

Now the only problem i've noticed* is if the croxley link goes ahead
the platform at watford high street won't be legal. If the platforms
could be extended they could be really long (essentially different
platforms on the same stretch of line) and there could be a 1a and 1b,
a being a different hight to b. Another option is bakerloo line trains
using one platform and remaining on the same line into watford and met
line trains using another but this would probably mean that the
frequency would have to be lower than what we would want.

Thanks in advance for not shouting at me for bringing up an old
pointless arguement

*I'm not very good at noticing problems

  #2   Report Post  
Old September 22nd 03, 09:24 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 313
Default Bakerloo to Watford Junction

rublex wrote:
After reading through some retro messages and thinking
(happens once in a while) I think I have come up with a
reasonable(ish) plan for the shocking service in place
between harrow and wealdstone and watford jn.
Get rid of the 313s- they will have uses elsewhere.
lower platform hights between watford jn and harrow and
wealdstone and between queens park-euston (elsewhere the
hights are still kosher for the tube stock)
Get some trains with floors the same hight as tube stock to
run euston - watford metro services.
Get some tube stock that uses the same power methods as the
metro does (i.e. only using 3rd rail between queens
park-harrow and wealdstone) this will mean that the 4th
rail doesn't have to be fixed between harrow and watford.

Now the only problem i've noticed* is if the croxley link
goes ahead the platform at watford high street won't be
legal. If the platforms could be extended they could be
really long (essentially different platforms on the same
stretch of line) and there could be a 1a and 1b, a being a
different hight to b. Another option is bakerloo line
trains using one platform and remaining on the same line
into watford and met line trains using another but this
would probably mean that the frequency would have to be
lower than what we would want.

Thanks in advance for not shouting at me for bringing up an
old pointless arguement

*I'm not very good at noticing problems


Has the 4th rail been lifted between Harrow and Watford?


  #3   Report Post  
Old September 22nd 03, 10:16 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 2
Default Bakerloo to Watford Junction

For a lot of the way there is a fourth rail laid fairly loosely between the
running rails but it seems to be used for current transmission but is not in
place for proper current collection in the normal manner.
Baz


"Cast_Iron" wrote in message
...
rublex wrote:
After reading through some retro messages and thinking
(happens once in a while) I think I have come up with a
reasonable(ish) plan for the shocking service in place
between harrow and wealdstone and watford jn.
Get rid of the 313s- they will have uses elsewhere.
lower platform hights between watford jn and harrow and
wealdstone and between queens park-euston (elsewhere the
hights are still kosher for the tube stock)
Get some trains with floors the same hight as tube stock to
run euston - watford metro services.
Get some tube stock that uses the same power methods as the
metro does (i.e. only using 3rd rail between queens
park-harrow and wealdstone) this will mean that the 4th
rail doesn't have to be fixed between harrow and watford.

Now the only problem i've noticed* is if the croxley link
goes ahead the platform at watford high street won't be
legal. If the platforms could be extended they could be
really long (essentially different platforms on the same
stretch of line) and there could be a 1a and 1b, a being a
different hight to b. Another option is bakerloo line
trains using one platform and remaining on the same line
into watford and met line trains using another but this
would probably mean that the frequency would have to be
lower than what we would want.

Thanks in advance for not shouting at me for bringing up an
old pointless arguement

*I'm not very good at noticing problems


Has the 4th rail been lifted between Harrow and Watford?




---
Outgoing mail is certified Virus Free.
Checked by AVG anti-virus system (http://www.grisoft.com).
Version: 6.0.518 / Virus Database: 316 - Release Date: 11/09/03


  #4   Report Post  
Old September 23rd 03, 10:50 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 3
Default Bakerloo to Watford Junction

are the plans to run the Met over the Croxley link in any mature stage?
Has any one got an idea when it will open/..


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Watford Junction - Platforms 8&9 Out of Use for the for forseable future [email protected] London Transport 0 April 29th 07 09:24 PM
Withdrawal of Off Peak Inter-City services from Watford Junction to North West - Dec 2008 burkey London Transport 0 February 24th 07 12:35 AM
Mixed bag for transport schemes - Watford Junction Redevelopment & Croxley Link burkey London Transport 10 July 19th 06 05:12 PM
Watford Junction Travelcard question Alistair Bell London Transport 11 February 8th 04 05:39 PM
Watford Junction.. On the Met, Via Croxley... Brenda London Transport 14 October 6th 03 09:43 PM


All times are GMT. The time now is 08:35 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017