Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
|
|||
|
|||
Thameslink ATO Specification published
|
#2
|
|||
|
|||
Thameslink ATO Specification published
On Feb 24, 10:15 pm, Andrew Price wrote:
technical meetings IRSE? (If yes, I suppose you know that Alan Fisher died suddenly yesterday) Ohhhh ... yes ... and no I had not heard ... I see that news is on the official home page, my condolences to all. -- Nick |
#3
|
|||
|
|||
Thameslink ATO Specification published
Does this mean the end of the driver.
GOO here we come revenge of the Guard |
#4
|
|||
|
|||
Thameslink ATO Specification published
wrote in message ... Does this mean the end of the driver. GOO here we come revenge of the Guard 1 Get the guard to do conductor duties. 2 Introduce automation and get rid of the driver. That's the DLR for you. Peter |
#5
|
|||
|
|||
Thameslink ATO Specification published
wrote in message ... Does this mean the end of the driver. Did you read the linked specification at all? ATO will be used on Thameslink between St Pancras and Blackfriars only. Four stations... Paul |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
NLL Infrastructure specification agreed | London Transport | |||
How can you have a signal failure on an ATO system? | London Transport |