Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#4
![]() |
|||
|
|||
![]()
On Mar 2, 6:06*pm, Tom Barry wrote:
MIG wrote: On 2 Mar, 15:40, Paul Corfield wrote: Slightly surprised no one has mentioned this but http://www.tfl.gov.uk/corporate/medi...tre/11275.aspx says Tower Gateway has reopened. Paul Corfield via Google They had already said it was going to. http://groups.google.co.uk/group/uk....g/2ceede816329... It would have been handy for me if it had been open on Saturday, oh well. To be fair, there wasn't much of the DLR opened on the western section on Saturday, and not much Jubilee or District Line action either. *I actually took the river bus to Canary Wharf and back because there was literally no other decent option (train to Greenwich then DLR being the next best). *I actually spent an entire day mooching around town without ever going on a tube or bus - I managed to cope with just train, boat, walk and finally taxi. The river bus is good but expensive, and takes a lot of staff for the number of passengers (just under two bendy buses, I reckon, with something like five or six crew on board plus crew at the landing piers). *It's quick east of the Tower, though, my phone GPS had it at 50km/h+. Tom- The boat was probably a good plan on Saturday. Road users diverting because of the Blackheath Hill situation must have been delighted by the fact that the Rotherhithe tunnel was closed. I was in the Tower Gateway area watching ridculous amounts of traffic jam, including DLR replacement buses trying to get through. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Tower Gateway DLR | London Transport | |||
Tower Gateway | London Transport | |||
Woolwich DLR and early re-opening of Tower Gateway | London Transport | |||
Thames Gateway | London Transport | |||
Manufacturing Gateway Gothenburg, Sweden. 19-21 October 2007 | London Transport |