London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old April 12th 09, 09:56 AM posted to uk.transport.london
MIG MIG is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2004
Posts: 3,154
Default Latest Strange Bank Situation

On Apr 5, 8:57*pm, "Tim Roll-Pickering" T.C.Roll-
wrote:
Mr Thant wrote:
Currently the only way out of the DLR platforms is by two parallel up
escalators, which from previous indications are near-enough life-
expired. If one of them has broken down (which it sounds like), then
that limits the number of passengers that the station can safely
handle, and therefore the number of trains (since the trains are
normally full).


Yes but I suspect the impact of this is going to be people trying to cram on
at Shadwell (or earlier stations), with all the potential problems arising
from such a situation. It's not really encouraing an alternative route that
people will take - the Jubilee Line doesn't serve the City.


I don't know if it's related to this, but I can't force the TfL
journey planner to give me a change from Northern to DLR at Bank (eg
Kings Cross to southern end of DLR).

Ticking via Bank it still sends me to London Bridge and Jubilee, and
if I try to trick it with via Shadwell, it sends me to Tower Gateway.

Given that that particular interchange involves walking down a
staircase, there really does seem to be a concerted effort to deny the
existence of Bank, no matter what inconvenience is caused. Like I've
said before, if all stations were treated like Bank, the whole of
central London LU would be permanently closed.
  #2   Report Post  
Old April 13th 09, 06:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Mar 2008
Posts: 36
Default Latest Strange Bank Situation

On Apr 12, 10:56*am, MIG wrote:

I don't know if it's related to this, but I can't force the TfL
journey planner to give me a change from Northern to DLR at Bank (eg
Kings Cross to southern end of DLR).

Ticking via Bank it still sends me to London Bridge and Jubilee, and
if I try to trick it with via Shadwell, it sends me to Tower Gateway.

Given that that particular interchange involves walking down a
staircase, there really does seem to be a concerted effort to deny the
existence of Bank, no matter what inconvenience is caused. *Like I've
said before, if all stations were treated like Bank, the whole of
central London LU would be permanently closed.


On a Saturday a couple of weeks back, when the Jubilee line was off, I
asked Journey Planner how to get from White City to Canary Wharf. Its
suggestion was to alight at St Paul's, take a 25 to Monument, and then
walk back to Bank station. I gleefully ignored it, and changed from
the Central Line to the DLR at Bank.
  #3   Report Post  
Old April 13th 09, 09:09 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Latest Strange Bank Situation

In article
,
(MIG) wrote:

I don't know if it's related to this, but I can't force the TfL journey
planner to give me a change from Northern to DLR at Bank (eg Kings Cross
to southern end of DLR).

Ticking via Bank it still sends me to London Bridge and Jubilee, and
if I try to trick it with via Shadwell, it sends me to Tower Gateway.

Given that that particular interchange involves walking down a
staircase, there really does seem to be a concerted effort to deny the
existence of Bank, no matter what inconvenience is caused. Like I've
said before, if all stations were treated like Bank, the whole of
central London LU would be permanently closed.


I discovered when going away on Friday that it's not just the
changing-at-Bank aversion that's a problem here.

I was planning a route from Cambridge to London City Airport on Good
Friday. So I tried the TfL Journey Planner for King's Cross St Pancras to
London City Airport and got a load of weird and wonderful routes all
including the uses of buses, even when I ticked Tube, DLR and NR only.

Then I noticed that King's Cross St Pancras Northern Line and the Jubilee
Line were out all weekend and some of the buses were Jubilee rail
replacements from West Ham to Canning Town. So, aware of the
changing-at-Bank aversion, I tried Bank-London City Airport which came out
simply as expected and King's Cross St Pancras to Bank.

Because of the KXSP Northern Line closure I was offered either Victoria
Line to Euston, then Northern line to Bank or Metropolitan or Hammersmith
and City (no Circle either this weekend) to Liverpool St and Central to
Bank. It absolutely refused to offer what seemed the best all round option
to me, Met or H&C to Moorgate and Northern from there. I even rang 020
7222 1234 who confirmed this was a perfectly sensible way to go where I
wanted but the web site was absolutely adamant. I had no problems actually
going that way either.

Why?

I also passed Barbican in daylight and could see that there is a perfectly
good ex-Thameslink down platform there. So why did their trains not call
there?

--
Colin Rosenstiel
  #4   Report Post  
Old April 13th 09, 11:22 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default Latest Strange Bank Situation


On Apr 13, 10:09*pm, wrote:

In article
,
(MIG) wrote:

I don't know if it's related to this, but I can't force the TfL journey
planner to give me a change from Northern to DLR at Bank (eg Kings Cross
to southern end of DLR).


Ticking via Bank it still sends me to London Bridge and Jubilee, and
if I try to trick it with via Shadwell, it sends me to Tower Gateway.


Given that that particular interchange involves walking down a
staircase, there really does seem to be a concerted effort to deny the
existence of Bank, no matter what inconvenience is caused. *Like I've
said before, if all stations were treated like Bank, the whole of
central London LU would be permanently closed.


I discovered when going away on Friday that it's not just the
changing-at-Bank aversion that's a problem here.

I was planning a route from Cambridge to London City Airport on Good
Friday. So I tried the TfL Journey Planner for King's Cross St Pancras to
London City Airport and got a load of weird and wonderful routes all
including the uses of buses, even when I ticked Tube, DLR and NR only.

Then I noticed that King's Cross St Pancras Northern Line and the Jubilee
Line were out all weekend and some of the buses were Jubilee rail
replacements from West Ham to Canning Town. So, aware of the
changing-at-Bank aversion, I tried Bank-London City Airport which came out
simply as expected and King's Cross St Pancras to Bank.

Because of the KXSP Northern Line closure I was offered either Victoria
Line to Euston, then Northern line to Bank [...]


That's the best route - at Euston there's cross-platform interchange
(or at least the deep-level tube equivalent thereof) between the
southbound Victoria line and the southbound Northern line Bank branch,
and the same in the northbound direction. It means one can travel on
one line from Euston to KXSP and then cross the platform and travel
back whilst notionally still going the same direction i.e. northbound
or southbound. Hours of fun. Maybe.


[...] or Metropolitan or Hammersmith
and City (no Circle either this weekend) to Liverpool St and Central to
Bank. It absolutely refused to offer what seemed the best all round option
to me, Met or H&C to Moorgate and Northern from there. I even rang 020
7222 1234 who confirmed this was a perfectly sensible way to go where I
wanted but the web site was absolutely adamant. I had no problems actually
going that way either.

Why?


Coz there are have been escalator works going on this past week
including the weekend. See this TfL press release:
http://www.tfl.gov.uk/corporate/medi...tre/11467.aspx

In particular these bits:

---quote---
[...]
This change is due to escalator works by London Underground at Bank
which will require one of the escalators connecting the DLR platforms
with the rest of the station to be shut down.
[...]
The work will take nine days to complete but by doing it over the
Easter break, the inconvenience of the service reduction will be
limited to just four normal working days before Easter.

The escalator work is due to be completed by Tuesday 14 April, when
full DLR services will be restored to Bank.
[...]
---/quote---


I also passed Barbican in daylight and could see that there is a perfectly
good ex-Thameslink down platform there. So why did their trains not call
there?


Whose trains? Do you mean why did northbound (ex-Moorgate) Thameslink
trains not call at Barbican? Easy - the platform wasn't long enough
for 8-car trains. I believe that in earlier eras ('BedPan' and indeed
pre-'BedPan') the trains in service may not have been as long as this.
  #5   Report Post  
Old April 14th 09, 12:45 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Latest Strange Bank Situation

In article
,
(Mizter T) wrote:

On Apr 13, 10:09*pm, wrote:

In article

,
(MIG) wrote:

I don't know if it's related to this, but I can't force the TfL
journey planner to give me a change from Northern to DLR at Bank
(eg Kings Cross to southern end of DLR).


Ticking via Bank it still sends me to London Bridge and Jubilee, and
if I try to trick it with via Shadwell, it sends me to Tower
Gateway.


Given that that particular interchange involves walking down a
staircase, there really does seem to be a concerted effort to deny
the existence of Bank, no matter what inconvenience is caused.
*Like I've said before, if all stations were treated like Bank,
the whole of central London LU would be permanently closed.


I discovered when going away on Friday that it's not just the
changing-at-Bank aversion that's a problem here.

I was planning a route from Cambridge to London City Airport on Good
Friday. So I tried the TfL Journey Planner for King's Cross St Pancras
to London City Airport and got a load of weird and wonderful routes
all including the uses of buses, even when I ticked Tube, DLR and NR
only.

Then I noticed that King's Cross St Pancras Northern Line and the
Jubilee Line were out all weekend and some of the buses were
Jubilee rail replacements from West Ham to Canning Town. So, aware
of the changing-at-Bank aversion, I tried Bank-London City Airport
which came out simply as expected and King's Cross St Pancras to Bank.

Because of the KXSP Northern Line closure I was offered either
Victoria Line to Euston, then Northern line to Bank [...]


That's the best route - at Euston there's cross-platform interchange
(or at least the deep-level tube equivalent thereof) between the
southbound Victoria line and the southbound Northern line Bank branch,
and the same in the northbound direction. It means one can travel on
one line from Euston to KXSP and then cross the platform and travel
back whilst notionally still going the same direction i.e. northbound
or southbound. Hours of fun. Maybe.


It still involves doubling back so the travel time must be longer, surely?

[...] or Metropolitan or Hammersmith and City (no Circle either
this weekend) to Liverpool St and Central to Bank. It absolutely
refused to offer what seemed the best all round option to me, Met
or H&C to Moorgate and Northern from there. I even rang 020 7222 1234
who confirmed this was a perfectly sensible way to go where I wanted
but the web site was absolutely adamant. I had no problems actually
going that way either.

Why?


Coz there are have been escalator works going on this past week
including the weekend. See this TfL press release:
http://www.tfl.gov.uk/corporate/medi...tre/11467.aspx

In particular these bits:

---quote---
[...]
This change is due to escalator works by London Underground at Bank
which will require one of the escalators connecting the DLR platforms
with the rest of the station to be shut down.
[...]
The work will take nine days to complete but by doing it over the
Easter break, the inconvenience of the service reduction will be
limited to just four normal working days before Easter.

The escalator work is due to be completed by Tuesday 14 April, when
full DLR services will be restored to Bank.
[...]
---/quote---


But we had no problem transferring from Northern to DLR platforms on
Friday! As TfL had told us!

Anyway, my "Why?" referred to my King's Cross to Bank journey, ignoring
any interchange issues at the latter. Why was the Met and Northern route
via Moorgate ignored? There were no works affecting that route.

I also passed Barbican in daylight and could see that there is a
perfectly good ex-Thameslink down platform there. So why did their
trains not call there?


Whose trains? Do you mean why did northbound (ex-Moorgate) Thameslink
trains not call at Barbican? Easy - the platform wasn't long enough
for 8-car trains. I believe that in earlier eras ('BedPan' and indeed
pre-'BedPan') the trains in service may not have been as long as this.


Pre-BedPan maybe. The 317s were also 8 car surely? I suppose the platform
is shorter than the Met platforms but then so is the Up platform.

--
Colin Rosenstiel


  #6   Report Post  
Old April 13th 09, 03:30 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2005
Posts: 392
Default Latest Strange Bank Situation

In message
of
Sun, 12 Apr 2009 02:56:17 in uk.transport.london, MIG
writes
On Apr 5, 8:57*pm, "Tim Roll-Pickering" T.C.Roll-
wrote:
Mr Thant wrote:
Currently the only way out of the DLR platforms is by two parallel up
escalators, which from previous indications are near-enough life-
expired. If one of them has broken down (which it sounds like), then
that limits the number of passengers that the station can safely
handle, and therefore the number of trains (since the trains are
normally full).


Yes but I suspect the impact of this is going to be people trying to cram on
at Shadwell (or earlier stations), with all the potential problems arising
from such a situation. It's not really encouraing an alternative route that
people will take - the Jubilee Line doesn't serve the City.


I don't know if it's related to this, but I can't force the TfL
journey planner to give me a change from Northern to DLR at Bank (eg
Kings Cross to southern end of DLR).


I chased this some time ago. Sadly, I must have done so by 'phone - I
don't have a record of the conversation. I was told the software con
only cope with all interchanges permitted or no interchanges permitted
at a station. I cope by putting in details of a journey to Bank and
another from it.


Ticking via Bank it still sends me to London Bridge and Jubilee, and
if I try to trick it with via Shadwell, it sends me to Tower Gateway.

Given that that particular interchange involves walking down a
staircase, there really does seem to be a concerted effort to deny the
existence of Bank, no matter what inconvenience is caused. Like I've
said before, if all stations were treated like Bank, the whole of
central London LU would be permanently closed.


There also seems to be a conspiracy for Public Address Messages to tell
people that interchange at Bank is more restricted than it actually is.
--
Walter Briscoe
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Latest changes at Monument/Bank Paul Oter London Transport 8 November 18th 08 02:27 PM
Latest score Mick Tully London Transport 7 July 21st 05 11:41 PM
Latest minicab problem John Rowland London Transport 1 March 3rd 05 11:43 AM
Livingstone's latest wheeze John Rowland London Transport 31 October 27th 04 04:23 PM
Latest official Crossrail Line Diagram John Rowland London Transport 0 August 4th 04 10:10 AM


All times are GMT. The time now is 06:54 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017