Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On 12 May, 22:08, Mizter T wrote:
Interesting, thanks - I'm obviously out-of-date on all this! So, originally we had TfL planning to do up the bridges and quadruple the line through Camden Road as part of the broader NLL upgrade works; It was never "quadrupling" at Camden Road in any meaningful way. It would have meant the eastbound freight loop starting slightly further west (before rather than after the station) and providing a bay platform for turning shuttles. A lot of money to spend for very little benefit. then TfL (and NR) discovering that this would all cost too much given the fixed budget they had; then the DfT agreeing to fund it anyway because it was really important work; AIUI they had a fixed amount of money to play for the entire NLL scheme and decided the Camden part of the scheme couldn't be done within the budget. By not doing Camden, they're now significantly under budget, and the debate is about whether the DfT gets the remaining money back or whether TfL can spend it on something else. satisfied with a less costly solution that doesn't involve 'quad-ing' the track but instead relies on freight loops - is that a fair summary? It was always freight loops. U |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Just begging for a graffitier with a sense of humour | London Transport | |||
Last unpainted D Stock (last "silver" Underground train) | London Transport | |||
Liverpool Street Blockade - What can be seen? | London Transport | |||
[OT] Mysteries seen from the air | London Transport | |||
Just Seen bendibus now on 73 | London Transport |