Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
|
|||
|
|||
Britains Crap Roads, Answers wanted
"Paul Weaver" wrote in message news On Sat, 01 Nov 2003 12:46:18 +0000, Chris Jones wrote: It took 15 years of Hell before Junction 8 on the M62 was finished. The Trafford Centre fares better, however the metro doesn't go there. The Trafford Centre only received planning permission on the basis that the Greater Manchester LRT System (Metrolink) would reach the Dumplington complex *before* the centre opened, in order to reduce the traffic chaos. Either they've broken the rules (perhaps this was changed after the public inquiry) or they widened the M63/M60 instead? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
District Line is crap | London Transport | |||
Normal crap service resumed | London Transport | |||
Lost annual Oystercard and forgot security answers | London Transport | |||
Oyster card help line - why so crap? | London Transport | |||
Google crap | London Transport |