Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
Some people who've lived near the NLL for longer than I have are telling
me that some 10 or possibly 15 years ago, the North London Line (or part of it) was closed *for two years* while the track was upgraded for use by Regional Eurostars (e.g. to enable them to get from the WLL near North Pole to the ECML). I've read that lots of money was spent on infrastructure improvements for Regional Eurostars, in addition to building the trains themselves, and it seems plausible that this included some track renewals or other work on the NLL. But two years' closure? Not only does that seem excessive and unlikely, but I can find no mention of it in online articles on the NLL. Can anyone shed any light on the matter, preferably with references, online or otherwise? If the track was renewed in the '90s, was other work done at the same time, e.g. on signalling or power supplies? -- Richard J. (to email me, swap 'uk' and 'yon' in address) |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
NLL Closure / DLR to Stratford International | London Transport | |||
Will Oyster PP be valid on the NLL ? | London Transport | |||
TfL / NLL / Metronet surface stock / tube stock / Croxley link | London Transport | |||
My Epping and Ongar railway History website will be have a reopening next wednesday FULL HISTORY"! | London Transport | |||
NLL via Crossrail tunnels | London Transport |