Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#2
![]() |
|||
|
|||
![]()
On Jul 28, 11:06*am, "Recliner" wrote:
wrote in message In article , () wrote: Paul Corfield wrote: The first two were rumoured to go into service about 10 days ago. They didn't. There are all sorts of comments flying around as to why they didn't but it seems like paperwork is the issue. *There are apparently several units ready to start service having accumulated sufficient fault free running. As others have said more units are at Willesden awaiting preparation and enough trained drivers while even more are stacked up at Derby. The 378s under delivery now are dual voltage for overhead and third rail current collection. The fleet for the East London Line are DC only. I see. But is it safe to say there's really no difference between the 378s that will run on the East London Line and those that will run on the North London line, save for the fact that one part of the fleet will have a pantographs mounted on their roofs? and transformers. If they are not needed, quite a bit of weight will be saved, and the energy needed to carry them around unnecessarily. Also, initially the NLL fleet will only have three carriages, whereas the ELL fleet is 4 car from day one. For the record, when I asked TfL to confirm the date they're turning the juice on, they said the 9th August to me. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
[OT] Standard says sorry, relaunches, will now be nice | London Transport | |||
OT (sorry) Paris Metro help | London Transport | |||
Electric or Hybrid Card or something car, suggestions? | London Transport | |||
Electric or Hybrid Card or something car, suggestions? | London Transport | |||
Electric or Hybrid Card or something car, suggestions? | London Transport |