London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #7   Report Post  
Old September 8th 09, 05:18 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2006
Posts: 1,147
Default EU lending for Crossrail

wrote:

I thought Crossrail was being built? Because they have already started work,
are you saying this work could be stopped?


That is what happened to the Channel Tunnel in 1970-something.

--
Arthur Figgis Surrey, UK
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] E27002 London Transport 2 May 21st 10 06:13 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) Aidan Stanger London Transport 3 August 12th 04 06:12 PM
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) [email protected] London Transport 3 August 9th 04 03:06 PM


All times are GMT. The time now is 01:33 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017