Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]() On Sep 8, 7:13*pm, 1506 wrote: Has actual tunneling started? *I thought it was just station boxes under other construction and the like? No tunnelling is happening. AIUI only the Canary Wharf (aka Isle of Dogs) station box has started construction proper. Otherwise I think it's all pretty much various preparatory works. Tottenham Court Road tube station is in the early stages of being reconstructed which all links in with Crossrail, but I don't think any major Crossrail centric works are due to happen there for a while (not too up on the TCR timetable though I admit). The big kick off of major construction work is yet to come. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport |