Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#23
![]() |
|||
|
|||
![]()
GazK wrote:
Don't forget the loss of capacity due to increased dwell times loading a DD train... Dwell time issue only become significant if the train a significant percentage of the passenger carrying capacity of the DD train boards/alights at every stop on the route. In most systems that doesn't happen, with large boarding/alighting flows only occurring at a relatively small number of stops along the route. Bill Bolton Sydney, Australia |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Boris: Crossrail not yet "signed, sealed and delivered" [was:Transport Secretary vows to finish Crossrail] | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport | |||
Optimum configuration of Crossrail (Was: Diesel Electric Trains on CrossRail) | London Transport |