Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
|
|||
|
|||
Planning Permission Required for extra track at South Ruislip!
On Apr 4, 1:11*pm, Bruce wrote:
The Evergreen 3 project investment has been approved by DfT Rail, but that in no way negates the need to follow the normal planning process. For info, I believe the application under discussion can be found on London Borough of Hillingdon's planning webpage by searching for planning application reference 66712/APP/2010/103 http://www.hillingdon.gov.uk/index.jsp?articleid=10058 Its location is Northolt Junction Civic Way Ruislip and it proposes "Track and junction improvements involving widening the existing up line embankment for 1.2km; stabilising the existing embankment; laying a second track South of existing up main line; provision of new junctions; replacing the existing single track bridge over Civic Way with a double track bridge; infilling redundant under bridge and ancillary works." Documents including a planning statement and plans are included with the application. Cross-posted to uk.transport.london. Kind regards, Dominic |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Ticketing facilities at South Ruislip LU station | London Transport | |||
Track Charts or Track maps of the London Underground | London Transport | |||
reaction to commuter electric scooter required | London Transport | |||
DRIVERS REQUIRED | London Transport | |||
photocard for weekly travelcards for only zones 1 and/or 2 required again | London Transport |