Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#13
![]() |
|||
|
|||
![]()
On 25 May, 22:13, Mizter T wrote:
On May 25, 9:15*pm, MIG wrote: [snip] The SET tables are now causing me some fun. In 199 the peak Orpington to Charing Cross trains seem to have been shifted forwards (or is that back?) by twenty minutes relative to all the other trains. *(They are in the slot where the one twenty minutes earlier should go.) A bit more worrying is that the morning peak times seem to be the same as they were in the previous timetable, but on the ground this week, some of them seem to have been rejigged, eg a Bexleyheath line train to Charing Cross is two minutes earlier than it was, and in a different order through the junction at Lewisham I think, but in the timetable book it's unchanged in both 199 and 200. What about in the Southeastern timetable booklets? See:http://www.southeasternrailway.co.uk...ey/timetables/ Yes, I thought of that just after posting, and their PDF is the same as in the timetable book, but not the same as what was happening on the platforms. I'll bang off an enquiry. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
ELL Late Preview | London Transport | |||
ELL Late Preview | London Transport | |||
Preview of new TfL website | London Transport | |||
No comments about the ELL? | London Transport | |||
ELL dot matrixes | London Transport |