London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old June 13th 10, 03:00 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2006
Posts: 87
Default Terminating in a through platform then returning "wrong direction"

Are there ever occasions during planned or unplanned service
disruption where an LU train heading say "eastbound" will require to
finish its journey in the "eastbound" platform of a two-platform
station, pick-up intending "westbound" passengers for the next
departure whilst still on the "eastbound" platform then head
"westbound" on the "eastbound" line in order to access a crossover to
the "westbound" line?

--
gordon
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
ELL "through" patronage Graham Harrison[_2_] London Transport 0 June 7th 10 08:38 PM
Same Destination, Opposite Direction John Ray[_3_] London Transport 28 February 10th 10 08:32 PM
Departing from Gatwick, returning from Heathrow Michael Hoffman London Transport 16 February 7th 05 09:38 PM
Southbound train via Bank terminating at Kennington? Sir Benjamin Nunn London Transport 6 December 13th 04 11:13 PM
Tube direction Ruud London Transport 16 February 28th 04 10:10 PM


All times are GMT. The time now is 05:06 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017