Home |
Search |
Today's Posts |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
|
LinkBack | Thread Tools | Display Modes |
#11
|
|||
|
|||
Wimblewares and the planned H&C closure
On 8 July, 23:08, wrote:
I accept there could be layover time at Edgware Road but it can take that easily enough with 4 platforms and the Circle the only other service. I thought both Wimbleware and H&C services had the same number of trains per hour but don't have access to a WTT to check. Both are 10-minute headways. The concept of extending the Wimbledons onwards from Edgware Road seems a worthy endeavour even if they could only be run as far as Moorgate to strengthen the Pad/Eus/KgxStP corridor's provision. A big big timetabling exercise no doubt but that hasn't prevented LU/LT from devising this type of thing in the past. By the way LU will send out a complete set of their current WTTs in the form of photocopied A4 sheets if you send an e-mail to them headed Freedom of Information Request should you wish access to some or all of their WTTs. -- gordon |
Reply |
|
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Planned engineering work between Acton Town and Hammersmith this weekend | London Transport | |||
Oyster Pre-Pay - Does Anyone Have Planned Launch Date | London Transport | |||
Planned engineering works | London Transport | |||
Planned engineering works | London Transport |