Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#3
![]() |
|||
|
|||
![]() "1506" wrote in message ... AFIK there will be a new set of entrances with their own suspended slab above the Thameslink and Circle platforms. No there isn't. You must have the drawings the wrong way up. The new slab is above the southward extensions of the Thameslink platforms. There are no significant improvements to the existing length of the central island, ie between southbound Thameslink and westbound Circle. Paul S |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Farringdon Station - Network Rail video | London Transport | |||
Heathrow's busiest ever month - July 2010 | London Transport | |||
No drivers on busiest line after 2010 | London Transport | |||
London's busiest level crossing? | London Transport | |||
Busiest Stretch of line | London Transport |