#1
![]() |
|||
|
|||
![]()
As of this morning, a lot of the clutter and barricades (platform
side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? |
#2
![]() |
|||
|
|||
![]()
On 31 July, 16:08, "Dr. Sunil" wrote:
As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? So, how many platforms will Stratford have when completed? They now seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and 10a need to be added, making 19 in total, serving 18 tracks; is that correct? Quite a change from when I first got to know the station in the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other than occasional use. Even 1 and 2 were only used by the little-known service from north Woolwich to Tottenham Hale. Does anybody know when platforms 12 and the old 13 were closed, and the part of the subway leading to them was bricked up? When the old subway was being cleaned up, the wall removed and the steps up to the platform re-built an old poster frame had been dragged out of one of the doorways leading off this subway, along with some rotten wood, and there was the remains of a timetable on it, which listed a few trains to Hertford East from platform 12, but I couldn't see any date on it. I always knew that the station, and the area in general, was going to see a change in its fortunes. The station really was in a terrible state at that time, despite the fact that it was only about 25 years since the last refurbishment fot the Central Line extension and the Shenfield electrification. |
#3
![]() |
|||
|
|||
![]()
On 2 Aug, 15:37, wrote:
On 31 July, 16:08, "Dr. Sunil" wrote: As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? So, how many platforms will Stratford have when completed? *They now seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and 10a need to be added, making 19 in total, serving 18 tracks; is that correct? *Quite a change from when I first got to know the station in the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other than occasional use. *Even 1 and 2 were only used by the little-known service from north Woolwich to Tottenham Hale. Does anybody know when platforms 12 and the old 13 were closed, and the part of the subway leading to them was bricked up? *When the old subway was being cleaned up, the wall removed and the steps up to the platform re-built an old poster frame had been dragged out of one of the doorways leading off this subway, along with some rotten wood, and there was the remains of a timetable on it, which listed a few trains to Hertford East from platform 12, but I couldn't see any date on it. I always knew that the station, and the area in general, was going to see a change in its fortunes. *The station really was in a terrible state at that time, despite the fact that it was only about 25 years since the last refurbishment fot the Central Line extension and the Shenfield electrification. 1 and 2 London Overground 3, 3a and 6 Central line (3 and 3a same track) 4a and 4b DLR via Bow Church 5 and 8 Shenfield services 9 and 10 Mainline services (beyond Shenfield) (10a not used except during engineering works?) 11 and 12 Tottenham Hale/Stansted services 13, 14 and 15 Jubilee line 16 and 17 DLR Stratford International/West Ham 18 platforms in regular service, serving 17 tracks, with a 19th platform serving an 18th track in occasional use (actually are both DLR platform 4s in regular use?) |
#4
![]() |
|||
|
|||
![]() "Dr. Sunil" wrote in message news:62d5b9a7-28be-4111-bbba- (actually are both DLR platform 4s in regular use?) Yes - 4a and 4b seem to be used alternately in the normal weekday timetable. Paul S |
#5
![]() |
|||
|
|||
![]()
On Mon, 02 Aug 2010 16:04:21 +0100, Paul Scott wrote:
"Dr. Sunil" wrote in message news:62d5b9a7-28be-4111-bbba- (actually are both DLR platform 4s in regular use?) Yes - 4a and 4b seem to be used alternately in the normal weekday timetable. Paul S Yes, during the day (though frustratingly, not at the peak) there's a 5 minute interval service where one train pulls into one platform, and another train pulls out of the other platform, which means that there's always a train in the station, and no mad rush for seats with people trying to get on while people are getting off. I think I'm right in saying that during those times, there's only service as far as Canary Wharf when running this system. |
#6
![]() |
|||
|
|||
![]()
On 2 Aug, 15:44, "Dr. Sunil" wrote:
On 2 Aug, 15:37, wrote: On 31 July, 16:08, "Dr. Sunil" wrote: As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? So, how many platforms will Stratford have when completed? *They now seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and 10a need to be added, making 19 in total, serving 18 tracks; is that correct? *Quite a change from when I first got to know the station in the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other than occasional use. *Even 1 and 2 were only used by the little-known service from north Woolwich to Tottenham Hale. Does anybody know when platforms 12 and the old 13 were closed, and the part of the subway leading to them was bricked up? *When the old subway was being cleaned up, the wall removed and the steps up to the platform re-built an old poster frame had been dragged out of one of the doorways leading off this subway, along with some rotten wood, and there was the remains of a timetable on it, which listed a few trains to Hertford East from platform 12, but I couldn't see any date on it. I always knew that the station, and the area in general, was going to see a change in its fortunes. *The station really was in a terrible state at that time, despite the fact that it was only about 25 years since the last refurbishment fot the Central Line extension and the Shenfield electrification. 1 and 2 London Overground 3, 3a and 6 Central line (3 and 3a same track) 4a and 4b DLR via Bow Church 5 and 8 Shenfield services 9 and 10 Mainline services (beyond Shenfield) (10a not used except during engineering works?) 11 and 12 Tottenham Hale/Stansted services 13, 14 and 15 Jubilee line 16 and 17 DLR Stratford International/West Ham 18 platforms in regular service, serving 17 tracks, with a 19th platform serving an 18th track in occasional use (actually are both DLR platform 4s in regular use?) How are the platforms at Internationaal numbered/lettered? |
#7
![]() |
|||
|
|||
![]()
On 2 Aug, 23:30, wrote:
On 2 Aug, 15:44, "Dr. Sunil" wrote: On 2 Aug, 15:37, wrote: On 31 July, 16:08, "Dr. Sunil" wrote: As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? So, how many platforms will Stratford have when completed? *They now seem to be numbered 1-17, but 4 and 7 don't exist, and 3a, 4a, 4b and 10a need to be added, making 19 in total, serving 18 tracks; is that correct? *Quite a change from when I first got to know the station in the '70s, when 1, 2, 3, 5, 6 and 8 were the only ones which saw other than occasional use. *Even 1 and 2 were only used by the little-known service from north Woolwich to Tottenham Hale. Does anybody know when platforms 12 and the old 13 were closed, and the part of the subway leading to them was bricked up? *When the old subway was being cleaned up, the wall removed and the steps up to the platform re-built an old poster frame had been dragged out of one of the doorways leading off this subway, along with some rotten wood, and there was the remains of a timetable on it, which listed a few trains to Hertford East from platform 12, but I couldn't see any date on it. I always knew that the station, and the area in general, was going to see a change in its fortunes. *The station really was in a terrible state at that time, despite the fact that it was only about 25 years since the last refurbishment fot the Central Line extension and the Shenfield electrification. 1 and 2 London Overground 3, 3a and 6 Central line (3 and 3a same track) 4a and 4b DLR via Bow Church 5 and 8 Shenfield services 9 and 10 Mainline services (beyond Shenfield) (10a not used except during engineering works?) 11 and 12 Tottenham Hale/Stansted services 13, 14 and 15 Jubilee line 16 and 17 DLR Stratford International/West Ham 18 platforms in regular service, serving 17 tracks, with a 19th platform serving an 18th track in occasional use (actually are both DLR platform 4s in regular use?) How are the platforms at Internationaal numbered/lettered? The mainline station platforms are numbered 1 to 4. Two extra fast tracks, not served by any platforms, pass through in between the tracks with platforms. A seventh track rises up in between platforms 2 and 3 to access Temple Mills Depot to the northeast of the station. I presume the DLR station, being in a separate building, will have its own numbers/letters (probably the latter?). |
#8
![]() |
|||
|
|||
![]()
On 5 Aug, 12:38, "Dr. Sunil" wrote:
I presume the DLR station, being in a separate building, will have its own numbers/letters (probably the latter?).- Hide quoted text - Separate building? Couldn't they have built the main station to take the DLR as well? |
#9
![]() |
|||
|
|||
![]()
Greetings.
In article , Dr. Sunil wrote: As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? I noticed this as well. Am I correct in assuming that this will be part of a Spanish platform system? If so, will either of the platforms be exclusively for ingress or egress? Or will one or both platform afford both embarkation and disembarkation? Regards, Tristan -- _ _V.-o Tristan Miller Space is limited / |`-' -=-=-=-=-=-=-=-=-=-=-=-=-=-=- In a haiku, so it's hard (7_\\ http://www.nothingisreal.com/ To finish what you |
#10
![]() |
|||
|
|||
![]()
On 3 Aug, 09:50, Tristan Miller wrote:
Greetings. In article ,Dr. Sunil wrote: As of this morning, a lot of the clutter and barricades (platform side) had been removed from the new Central westbound platform (3a), though the concourse accesses were still blocked off by hoardings. Anyone know when it will open? I noticed this as well. *Am I correct in assuming that this will be part of a Spanish platform system? *If so, will either of the platforms be exclusively for ingress or egress? *Or will one or both platform afford both embarkation and disembarkation? Regards, Tristan -- * *_ * _V.-o * * * *Tristan Miller * * * * * *Space is limited */ |`-' -=-=-=-=-=-=-=-=-=-=-=-=-=-=- * *In a haiku, so it's hard (7_\\ *http://www.nothingisreal.com/* *To finish what you I think the idea is to have one side ingress-only and vice versa. Not sure which side though! There is a cross-platform interchange to consider too (platform 5 for Liverpool Street). |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New Central Line platform at Stratford | London Transport | |||
Stratford Regional-Stratford Intl on DLR | London Transport | |||
Stratford platform changes | London Transport | |||
Stratford platform widening | London Transport | |||
No platform adverts at St Paul's | London Transport |