London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #21   Report Post  
Old September 7th 10, 05:34 PM posted to uk.railway,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Dec 2008
Posts: 280
Default Oyster Extension Permits

On 07/09/10 17:32, Ivor The Engine wrote:

So how would this situation be treated:
I and a colleague travelled from Euston to Richmond. I have PAYG, he
has a Z1-2 season.

Outward journey from Euston on Overground, via Willesden Jn. Touched
in at Euston, £1.30 PAYG for colleage indicated on exiting Richmond
station.

On the return journey, just missed Overground so caught the first
Waterloo train, changing at Vauxhall. Colleague charged £1.50 on
exit. As we didn't decided to use NR until the last minute, should my
colleague have tried to set an OEP for the return?


No. When your colleague touched in at Richmond, this would have
initiated a PAYG journey, since Richmond is outside his zones - so no
need for an OEP.

If you'd used NR on the outwards journey he would have needed an OEP,
though. That's because touching in at Euston wouldn't normally start a
PAYG jouney since it's within his zones - the OEP makes sure that it does.

Basically NR are worried about people touching in within their zones and
then leaving the system at an ungated NR station without touching out -
therefore never having touched an Oyster reader outside their zones and
hence not paying for their journey. What the OEP does is force the
system to use the normal PAYG rules even if you start your journey
within the zones; in that case (i.e. with the OEP) the normal PAYG rules
would apply and he'd be charged a maximum fare if he failed to touch out.

-roy
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Arriva says scrap all that integrated national rail ticketing nonsense Roland Perry London Transport 1 January 29th 15 09:43 AM
C2C to pilot South East Flexible Ticketing scheme Richard London Transport 3 September 21st 13 12:05 AM
Oyster Extension Permits (OEPs) Mudchute[_2_] London Transport 113 January 15th 10 07:09 AM
Integrated Kent Franchise Terry Harper London Transport 2 November 30th 05 03:09 PM
London's Integrated Transport Policy Mick London Transport 19 May 13th 05 05:13 PM


All times are GMT. The time now is 12:23 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017