Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]() "Charles Ellson" wrote in message ... On Wed, 29 Dec 2010 16:21:33 -0000, "Paul Scott" wrote: HSTs (rather than Mk3 coaches) are only cleared into platforms 17, 18 and 19. As this is a subset of the platforms allowing Mk3 coaches, the suspicion is that it's the power cars themselves that are the critical issue for gauging. Isn't it the trouble with part of the linkage on some Mk3 bogies being liable to argue with the conductor rails at some locations ? Various articles found via Google suggest that most but not all Western HSTs have short swing links so if there is the odd chance (or the certainty?) of the wrong one turning up then somebody could be shutting the stable door before the horse bolts (or goes off bang) ? Diagramming the correct trains fitted with SSL bogies has to be taken as read, surely? I've discussed this in another forum and it has been stated there that the main gauging problem within Waterloo is the crew access steps on the outside of the power car bogies. There are also issues with some stations between Staines and Reading, (not relevant to the current situation) where there is a 5 mph speed limit for HSTs due to the same factors. Paul |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
HST footbridge at Shepherd's Bush | London Transport | |||
HST on west london freight line | London Transport | |||
HST at Waterloo today | London Transport | |||
West Barnes Lane LC - New Malden | London Transport | |||
Mortlake - Barnes Bridge link line | London Transport |