Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#6
![]() |
|||
|
|||
![]()
In article ,
Mwmbwls wrote: On Mar 18, 11:14*am, "Paul Scott" wrote: "This Network Change Notice outlines Network Rail's proposal for works associated with remodelling Platform 2 at Clapham Junction to create two separate platforms with segregated working." Clapham Junction to Shepherds Bush is becoming increasingly popular.The existing platform two now gets fairly crowded at peak times and when delays occur. Do Network Rail propose to extend the platform by filling in the void left by the closure of platform one?. In which case are the existing supporting pillars, supporting the former trackbed up to the load?. I am surprised that the Cambridge solution is being considered. Out of interest, why cannot Platform 1 be reinstated ? I've not been to CJ for some years as you may be able to deduce ![]() Nick -- Serendipity: http://www.leverton.org/blosxom (last update 29th March 2010) "The Internet, a sort of ersatz counterfeit of real life" -- Janet Street-Porter, BBC2, 19th March 1996 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Overground SLL link | London Transport | |||
Signalling alterations Elephant & Castle | London Transport | |||
Diversion of SLL services from London Bridge | London Transport | |||
Usin Clapham juinction with huges bags ? | London Transport | |||
Network rail & Clapham Junction | London Transport |