I have read in these newsgroups that the only two things holding up
the electrification of the GOBLIN and the implementation of 378s on this route are the short platforms at South Tottenham station (necessitated by the junctions at either end) and the inability to find funding for the electrification. Are both of these problems still without solutions, or are there solutions available awaiting the necessary funding (which won't arrive until 2016 at the earliest IMHO)? Also, are the 172s any good? I've not sampled them yet so I'm interested to know if the GOBLIN has had a mini-sparks effect thanks to the newer trains. |
#2
![]() |
|||
|
|||
![]()
TheOneKEA wrote:
short platforms at South Tottenham station (necessitated by the junctions at either end) Back in the day, when the service ran from Kentish Town, it was 4-car DMUs with people opening their own doors. If 378s have SDO (perhaps even if they don't, given where the doors are), then there shouldn't be any problem, should there? Also, are the 172s any good? I like them. They are clean (and look like it will be easy to keep them that way), comfortable, and fairly well-used. I'm interested to know if the GOBLIN has had a mini-sparks effect thanks to the newer trains. I can't say if more people are travelling than before, but what's against the line is that few of the stations have direct interchanges with other lines, so it's always going to be among the quieter lines in its area. Mind you, there has been plenty of work at most if not all the stations to make them more pleasant, so who knows. -- ..sig down for maintenance |
#3
![]() |
|||
|
|||
![]()
Chris Tolley wrote:
short platforms at South Tottenham station (necessitated by the junctions at either end) Back in the day, when the service ran from Kentish Town, it was 4-car DMUs with people opening their own doors. That was when the platforms were longer - they were cut in the 1990s. The problem at the west of the station isn't the junction but the A10. |
#4
![]() |
|||
|
|||
![]()
Tim Roll-Pickering wrote:
Chris Tolley wrote: short platforms at South Tottenham station (necessitated by the junctions at either end) Back in the day, when the service ran from Kentish Town, it was 4-car DMUs with people opening their own doors. That was when the platforms were longer - they were cut in the 1990s. The problem at the west of the station isn't the junction but the A10. One lives and learns. -- ..sig down for maintenance |
#5
![]() |
|||
|
|||
![]()
On 30/05/2011 03:24, TheOneKEA wrote:
I have read in these newsgroups that the only two things holding up the electrification of the GOBLIN and the implementation of 378s on this route are the short platforms at South Tottenham station (necessitated by the junctions at either end) and the inability to find funding for the electrification. Are both of these problems still without solutions, or are there solutions available awaiting the necessary funding (which won't arrive until 2016 at the earliest IMHO)? Also, are the 172s any good? I've not sampled them yet so I'm interested to know if the GOBLIN has had a mini-sparks effect thanks to the newer trains. I didn't think that there were plans to electrify the GOBLin, especially considering that they relatively recently received new rolling stock. If they do electrify, then will it be overhead or 3rd rail? Will they also use 378s? Are there enough available for such a service? |
#6
![]() |
|||
|
|||
![]()
On May 30, 10:37*am, "
wrote: I didn't think that there were plans to electrify the GOBLin, especially considering that they relatively recently received new rolling stock. I think it is planned, but I don't know on what timescale. If they do electrify, then will it be overhead or 3rd rail? It would be 25 kV overhead, as are the short sections of the line which are already electrified, Woodgrange Park Junction to Barking Station Junction and between the Junctions either side of South Tottenham station. Will they also use 378s? Are there enough available for such a service? Don't know. |
#7
![]() |
|||
|
|||
![]() |
#8
![]() |
|||
|
|||
![]() |
#10
![]() |
|||
|
|||
![]() |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
GOBLIN: FURTHER ELECTRIFICATION WORK. | London Transport | |||
Goblin to close for Electrification work | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport | |||
Goblin electrification | London Transport |