Actually, most DLR projects have been completed on time.
Sure, but completing on time is not the same as completing quickly. Any fool can allocate twice as much time as necessary to a project and then claim a great success when the project is completed on time.

  #22   Report Post  
Old June 15th 11, 05:58 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2010
Posts: 460
Default DLR Canning Town Stratford International - still not opened ...

"CJB" wrote in message
...

Why on earth didn't they put a chord in for trains to go direct from
say Bank to Stratord International etc.?


Presumably because there's already a faster route available via changes at
Poplar and Stratford?

Paul S

  #23   Report Post  
Old June 15th 11, 07:49 PM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: May 2008
Posts: 278
Default DLR Canning Town Stratford International - still not opened ...


"Peter Masson" wrote in message
...


"Tim Roll-Pickering" wrote

IIUC Stratford International for domestic services is a pick-up to
Kent/set-down to London only station.


Not the case. It is a normal stop, which will be much more useful when the
DLR gets there.

Peter


And I've travelled Stratford International to St Pancras buyiong ticket from
the man where the bus stop is in Stratford Regional.

  #24   Report Post  
Old June 15th 11, 10:07 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default DLR Canning Town Stratford International - still not opened ...


On Jun 15, 4:49*pm, Robin9 wrote:

'Recliner wrote:

Actually, most DLR projects have been completed on time.


Sure, but completing on time is not the same as completing quickly. Any
fool can allocate twice as much time as necessary to a project and then
claim a great success when the project is completed on time.


So basically they can't win against the inevitability in your mind
that they'll make a mess of it then? Finished late - bloody typical.
Finished early - bloody typical.

DLR projects have in the main been regarded as successes - this one
meanwhile has obviously not all been plain sailing.
  #25   Report Post  
Old June 16th 11, 11:33 AM posted to uk.transport.london,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 38
Default DLR Canning Town Stratford International - still not opened ...




I would have thought any Olympic-goers from Fenchurch St would just be
expected to use the West Ham gateway station.

What's wrong with Tower Hill, then a quick change at Mile End? It must be
almost the easiest station on LT to change at!




  #26   Report Post  
Old June 16th 11, 04:48 PM
Senior Member
 
First recorded activity at LondonBanter: Feb 2011
Location: Leyton, East London
Posts: 902
Default

Quote:
Originally Posted by Mizter T View Post
So basically they can't win against the inevitability in your mind
that they'll make a mess of it then? Finished late - bloody typical.
Finished early - bloody typical.
What an eccentric question! What makes you think I will complain if they finish a project early?
  #28   Report Post  
Old June 16th 11, 10:16 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2005
Posts: 6,077
Default DLR Canning Town Stratford International - still not opened ...


On Jun 16, 5:48*pm, Robin9 wrote:

Mizter T wrote:

So basically they can't win against the inevitability in your mind
that they'll make a mess of it then? Finished late - bloody typical.
Finished early - bloody typical.


What an eccentric question! What makes you think I will complain if they
finish a project early?


Your comments just upthread, that's what!
  #30   Report Post  
Old June 17th 11, 04:05 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jun 2011
Posts: 7
Default DLR Canning Town Stratford International - still not opened ...

Problems with the control system / software.

But there's still snagging going on at various locations.

This week at Canning Town...

a number of paving stones have been removed at intervals from the
'down' platform edge after huddles of contractors were seen examining
them. An alignment/ gauging problem, maybe?

and both the new stairwell and the original one still have coloured
netting draped over them


On 2011-06-14 17:42:37 +0100, CJB said:

This is clearly marked on numerous maps as opening in Autumn 2010. Its
Spring 2011 - what's the delay? CJB.





Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Canning Town - Stratford DLR fares G1206 London Transport 4 February 22nd 11 05:04 PM
DLR train testing between Canning Town - Stratford G1206 London Transport 15 December 17th 10 12:17 AM
Canning Town DLR flyover now open Mr Thant London Transport 1 June 2nd 09 08:47 PM
Work to start on DLR from Canning Town to Stratford International John Rowland London Transport 31 January 21st 07 01:37 PM
Canning Town DLR junctions TheOneKEA London Transport 7 November 25th 04 10:50 AM


All times are GMT. The time now is 07:47 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017