Whither Thameslink to Cambridge?
On Jul 18, 6:12*pm, "Peter Smyth" wrote:
The down line is actually called the Down Slow 2 rather than the Down Goods and is already used by evening peak Hertford trains that do not stop at Harringay or Hornsey. So it is: http://www.networkrail.co.uk/documen...20Upda te.pdf ...which helpfully lists both: * Alexandria Palace - Finsbury Park 3rd Up line project : Additional southbound platforms at Alexandria Palace and Finsbury Park and conversion of goods line from Alexandria Palace to Finsbury Park to passenger status (target 2013) * Alexandria Palace - Finsbury Park Down Slow 2 upgrade : Provide increased linespeeds (target 2014) |
Whither Thameslink to Cambridge?
On 18/07/11 20:18, Jamie Thompson wrote:
On Jul 18, 6:12 pm, "Peter wrote: The down line is actually called the Down Slow 2 rather than the Down Goods and is already used by evening peak Hertford trains that do not stop at Harringay or Hornsey. So it is: http://www.networkrail.co.uk/documen...20Upda te.pdf ..which helpfully lists both: * Alexandria Palace - Finsbury Park 3rd Up line project : Additional southbound platforms at Alexandria Palace and Finsbury Park and conversion of goods line from Alexandria Palace to Finsbury Park to passenger status (target 2013) * Alexandria Palace - Finsbury Park Down Slow 2 upgrade : Provide increased linespeeds (target 2014) That's ALEXANDRA. -- Phil Liverpool, UK |
All times are GMT. The time now is 10:22 PM. |
Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2006 LondonBanter.co.uk