London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old October 18th 11, 05:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2007
Posts: 139
Default Overrun of engineering work on the Wimbledon Branch

I understand that there a 12 hour overrun on engineering work on the
Wimbledon branch recently. Can any body tell me what happened?

Kevin


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Combining Hammersmith & City with Wimbledon branch? Paul Bowery London Transport 12 January 25th 08 07:25 PM
Wimbledon - East Putney engineering works Paul Scott London Transport 25 January 16th 08 12:20 AM
Wimbledon branch of District line - why us? [email protected] London Transport 2 April 13th 05 04:06 PM
Wimbledon branch of District line - why us? Chris London Transport 18 December 16th 04 01:40 PM
Overrun tunnels Boltar London Transport 12 October 24th 03 11:12 PM


All times are GMT. The time now is 12:59 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017