Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#10
![]() |
|||
|
|||
![]()
On Nov 11, 10:34*pm, wrote:
On Fri, 11 Nov 2011 20:54:41 +0000, Charles Ellson wrote: On Fri, 11 Nov 2011 08:35:12 -0800 (PST), allantracy wrote: The main benefit of the Croxley Link is connectivity between South Bucks (on the Met) and the WCML and vice-versa. To that end, perhaps Overground services from Euston could reverse and continue in an Amersham direction. You can't run 3rd-rail stock on the Met. Charles: I defer to your knowledge of the infrastructure, but what would have to be done, and how much would it cost to make this possible? Educate me. Regards JonH ...indeed, as would I. I'd have though they would be compatible as I thought all TfL's lines used the same 4 rail system of electrification, but even if they're not, I'd have thought they would be compatible by historical virtue that the LO shares tracks with (and is therefore compatible with) the Bakerloo, which used to have the branch to Stanmore, so effectively operated over the Met between Finchley Road and Wembley, though in reality only in and out of Neasden depot. I know a lot of time has passed, but I wouldn't have thought things would have diverged too much. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
ELL shut today "due to Network Rail engineering work" - hmm... | London Transport | |||
Decision on Croxley Rail Link due 'in next two weeks' | London Transport | |||
CROXLEY RAIL LINK decision due this year | London Transport | |||
PPP Arbiter announces draft decision | London Transport | |||
'Weekend Tubes': decision on later start and finish times | London Transport |