Default ELL shut today "due to Network Rail engineering work" - hmm...

From TfL's live travel news page, details on LO line closures today...

---quote---
No service between Dalston Junction and New Cross Gate/New Cross on
Sunday 12 May due to Network Rail engineering work. [...]

No service between New Cross Gate and West Croydon on Sunday 12 May due
to engineering works. [...]

No service between Sydenham and Crystal Palace on Sunday 12 May due to
engineering works. [...]

No service between Surrey Quays and Clapham Junction on Sunday 12 May
due to Network Rail engineering works. [...]

No service between Highbury and Islington and Dalston Junction on Sunday
12 May due to engineering work. [...]

No service between Watford Junction and Euston on Sunday 12 May due to
engineering works. [...]
---/quote---


Thing is, the line twixt Dalston Junction and New Cross/ NXG is neither
owned nor maintained by Network Rail - it's owned by TfL London Rail,
and maintained under contract by Carillion.

Odd that Network Rail gets specifically mentioned up on a line it's not
responsible for, whilst it doesn't get a mention on the other lines it
*is* responsible for (ok, it does get a mention re Surrey Quays to
Clapham Jn, for which it is responsible for south of the new junction
located just north of Queens Road Peckham - which must have a name,
perhaps the Old Kent Rd Junction?).

  #2   Report Post  
Old May 13th 13, 01:56 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2012
Posts: 21
Default ELL shut today "due to Network Rail engineering work" - hmm...

Paul Corfield wrote in
:

I understand (from the weekly E Mail) the work is "waterproofing works
at Canada Water"


Sponsored by Canada Dry perhaps?

Peter

--
|| Peter CS ~ Epsom ~ UK | pjcs02 [at] gmail.com |
  #3   Report Post  
Old May 13th 13, 08:18 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2010
Posts: 16
Default ELL shut today "due to Network Rail engineering work" - hmm...

On 12/05/2013 12:20, Mizter T wrote:
From TfL's live travel news page, details on LO line closures today...

---quote---
No service between Dalston Junction and New Cross Gate/New Cross on
Sunday 12 May due to Network Rail engineering work. [...]

No service between New Cross Gate and West Croydon on Sunday 12 May due
to engineering works. [...]


There was new track being laid just south of Honor Oak Park on Sunday,
but that was on the through line, I could see it from the bus stop.


No service between Sydenham and Crystal Palace on Sunday 12 May due to
engineering works. [...]

No service between Surrey Quays and Clapham Junction on Sunday 12 May
due to Network Rail engineering works. [...]

No service between Highbury and Islington and Dalston Junction on Sunday
12 May due to engineering work. [...]

No service between Watford Junction and Euston on Sunday 12 May due to
engineering works. [...]
---/quote---


Thing is, the line twixt Dalston Junction and New Cross/ NXG is neither
owned nor maintained by Network Rail - it's owned by TfL London Rail,
and maintained under contract by Carillion.

Odd that Network Rail gets specifically mentioned up on a line it's not
responsible for, whilst it doesn't get a mention on the other lines it
*is* responsible for (ok, it does get a mention re Surrey Quays to
Clapham Jn, for which it is responsible for south of the new junction
located just north of Queens Road Peckham - which must have a name,
perhaps the Old Kent Rd Junction?).


--
Martin

replies to newsgroup only please.
  #4   Report Post  
Old May 16th 13, 07:23 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2012
Posts: 2
Default ELL shut today "due to Network Rail engineering work" - hmm...

I think they use a different phrase now but it used to amuse me that in the weekly Weekend Engineering Work e-mail TfL line closures were always described as 'while we improve xxx' while NR closures were described just as 'maintenance work'
  #5   Report Post  
Old May 16th 13, 07:51 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default ELL shut today "due to Network Rail engineering work" - hmm...

In message , at
00:23:00 on Thu, 16 May 2013, Jon P
remarked:
I think they use a different phrase now but it used to amuse me that in the weekly Weekend Engineering Work e-mail TfL line closures were
always described as 'while we improve xxx' while NR closures were described just as 'maintenance work'


The numerous weekend bustitutions currently being suffered in the Ely
area are described by NR as arising from "route improvement" work.
--
Roland Perry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Station Shut Due To Burnt Toast Paul London Transport 5 April 23rd 10 08:06 PM
"Due to necessary engineering work...." K London Transport 6 March 29th 05 10:09 AM
Engineering work ticket validity Dave Arquati London Transport 0 February 22nd 05 04:10 PM
Weekend engineering work Lawrence Myers London Transport 2 November 25th 04 06:43 PM
Tramlink engineering work. Clive R Robertson London Transport 0 August 9th 04 09:24 AM


All times are GMT. The time now is 01:21 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017