Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]()
On 2012\09\27 07:27, Stephen Furley wrote:
Automatic Train Operation was tested on the Woodford - Hainault section before being introduced on the new Victoria Line. Was this section operated as a shuttle between these stations at that time, or did trains in passenger service run through at one or both ends, and just switch to ATO when running on the line so equipped? It was a shuttle. I would imagine only one train or perhaps two trains were so equipped. Did the ATO system remain in use on this line after the Victoria Line opened? No. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
I took 4 buses where I could have ridden a bike | London Transport | |||
Epping-Ongar Railway: Worth a look | London Transport | |||
Epping-Ongar Railway services commence | London Transport | |||
Oyster Pre pay : how does it know what route I took ? | London Transport | |||
Epping-Ongar news? | London Transport |