77002 wrote:

Fast forward to the Jubilee Line extension: This one was much less
well planned, but did manage provide a useful route with some
Useful until it heads of to stratford pointlessly duplicating the DLR.


It provides a direct link from east to south London, starting from east
London's biggest interchange station. It provides much needed pressure
relief for the DLR. It regularly fills up before it first hits the
Thames.
How is that not useful?


A role which previously the North London line filled. The Jubilee
Line is an expensive replacement. By now the North London Line to
Docklands would have been an Overground Link.


The North London Line in that part of town was okay if you wanted to go to
north London and if you could bear the infrequent service it was fine for
Silvertown and North Woolwich. But it was utterly useless for getting from
Stratford/West Ham/Canning Town to places south of the river. The
development in the docks was not adequately served - even three car DLR
trains are still slow (and the Waterloo & City heaving at the other end) and
no great substitute for a proper tube lin to the centre.

--
My blog: http://adf.ly/4hi4c


  #2   Report Post  
Old December 7th 12, 12:36 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Sep 2011
Posts: 267
Default London Battersea Northern Line extension now done with a loan?

On 7 Dec, 12:36, "Tim Roll-Pickering"
wrote:
77002 wrote:
Fast forward to the Jubilee Line extension: This one was much less
well planned, but did manage provide a useful route with some
Useful until it heads of to stratford pointlessly duplicating the DLR.
It provides a direct link from east to south London, starting from east
London's biggest interchange station. It provides much needed pressure
relief for the DLR. It regularly fills up before it first hits the
Thames.
How is that not useful?

A role which previously the North London line filled. *The Jubilee
Line is an expensive replacement. *By now the North London Line to
Docklands would have been an Overground Link.


The North London Line in that part of town was okay if you wanted to go to
north London and if you could bear the infrequent service it was fine for
Silvertown and North Woolwich. But it was utterly useless for getting from
Stratford/West Ham/Canning Town to places south of the river. The
development in the docks was not adequately served - even three car DLR
trains are still slow (and the Waterloo & City heaving at the other end) and
no great substitute for a proper tube lin to the centre.

Which is why I believe the NLL needed to be diverted from Silvertown
and North Woolwich, and instead run under the Thames to an interchange
with the Dartford lines. There would nothing to prevent an
interchange staion with a Jubilee route to Thamesmead.
  #3   Report Post  
Old December 7th 12, 04:54 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Nov 2007
Posts: 146
Default London Battersea Northern Line extension now done with a loan?

A role which previously the North London line filled. *The Jubilee
Line is an expensive replacement. *By now the North London Line to
Docklands would have been an Overground Link.


The North London Line in that part of town was okay if you wanted to go to
north London and if you could bear the infrequent service it was fine for
Silvertown and North Woolwich. But it was utterly useless for getting from
Stratford/West Ham/Canning Town to places south of the river. The
development in the docks was not adequately served - even three car DLR
trains are still slow (and the Waterloo & City heaving at the other end) and
no great substitute for a proper tube lin to the centre.


Which is why I believe the NLL needed to be diverted from Silvertown
and North Woolwich, and instead run under the Thames to an interchange
with the Dartford lines. *There would nothing to prevent an
interchange staion with a Jubilee route to Thamesmead.


In my eyes, the ideal situation given hindsight would have been for
the NLL's Poplar branch to have been renovated and tunnelled under the
river as the DLR was and linked to a rebuilt Greenwich Park branch,
which would then run through to Clapham Junction via Peckham Rye.
Likewise, there would have been little need to wait for Crossrail to
run from North Woolwich to Abbey Wood had the NLL been extended the
same way, with a service from the North Kent line running via Canning
Town and Stratford to the Goblin at South Tottenham, thence onward to
Willesden Junction and Richmond.

Given the demand between Stratford and Canary Wharf I believe a grade-
separated curve linking the two Crossrail branches would serve this
demand far better than the Jubilee line does, and it would enable more
use to be made of the capacity on the two branches (i.e. every train
to Canary Wharf from Whitechapel is a train to Shenfield that has to
use up capacity at Liverpool Street). Accordingly, the Jubilee could
then have it's branch to Thamesmead, with the DLR running alongside
the NLL up to Stratford.

....swinging back on topic, the Northern Line extension to Battersea
couldn't be more of a pig's ear if they tried, and funding it with a
loan is disgraceful. The capacity of the CX branch should be used to
extend south east, e.g. down to Crystal Palace via Loughborough
Junction, Herne Hill et. al. en route to the Hayes branch. A major
redevelopment of the drain (including lengthening the existing Bank
platforms to 8 car length and building new ones at Waterloo) would be
the ideal way to serve the Battersea area, with stations at Bank,
Blackfriars, Waterloo, Lambeth, Vauxhall, Nine Elms, Battersea Park,
Battersea High Street and Clapham Junction, with depot facilities
provided by London Road (the Bakerloo getting a new depot on its own
southern extension.)

Even if you accept that the drain proposal above is dependant on the
Bakerloo works to free up London Road, then simply building Clapham
Junction to Vauxhall then linking to Kennington is the way to do
things for the time being so you can just reuse the infrastructure
later in doing things properly. Likewise, the reasons given for not
interchanging with Vauxhall are bunk of the highest order. Routing the
line as required and hollowing out the platform tunnels is all that is
needed for passive provision until Crossrail 2 relieves the Victoria
line enough to permit the interchange being brought into use.
  #4   Report Post  
Old December 7th 12, 04:59 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,715
Default London Battersea Northern Line extension now done with a loan?

On 07/12/2012 17:54, Jamie Thompson wrote:
..swinging back on topic, the Northern Line extension to Battersea
couldn't be more of a pig's ear if they tried, and funding it with a
loan is disgraceful.


How else are you going to fund it?

The capacity of the CX branch should be used to
extend south east, e.g. down to Crystal Palace via Loughborough
Junction, Herne Hill et. al. en route to the Hayes branch. A major
r


IIRC Crystal Palace et al already have a railway service.

--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail
  #5   Report Post  
Old December 7th 12, 05:54 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Mar 2009
Posts: 48
Default London Battersea Northern Line extension now done with a loan?

On Dec 7, 5:59*pm, Graeme Wall wrote:
How else are you going to fund it?


From the developers whom will reap the financial benefits perhaps? I'm
not against a loan in the general per se, just against a taxpayer-
subsidised and guaranteed one, especially given the site's history of
financial imploding.

IIRC Crystal Palace et al already have a railway service.

It does indeed, however it operates on a two track railway that has to
be shared with longer-distance suburban services. Compare and contrast
the service provision of Crystal Palace and Hendon Central, both zone
3/4 stations...not to mention that removing the current services from
their respective termini frees up capacity there.


  #6   Report Post  
Old December 7th 12, 06:10 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,715
Default London Battersea Northern Line extension now done with a loan?

On 07/12/2012 18:54, Jamie Thompson wrote:
On Dec 7, 5:59 pm, Graeme wrote:
How else are you going to fund it?


From the developers whom will reap the financial benefits perhaps? I'm
not against a loan in the general per se, just against a taxpayer-
subsidised and guaranteed one, especially given the site's history of
financial imploding.


So best not to invest in some wastrel scheme to redevelop old docks the
other end of London then? After all the docks business imploded.

--
Graeme Wall
This account not read, substitute trains for rail.
Railway Miscellany at http://www.greywall.demon.co.uk/rail
  #7   Report Post  
Old December 7th 12, 08:40 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Oct 2011
Posts: 34
Default London Battersea Northern Line extension now done with a loan?

On 07/12/2012 18:54, Jamie Thompson wrote:
On Dec 7, 5:59 pm, Graeme Wall wrote:
How else are you going to fund it?


From the developers whom will reap the financial benefits perhaps? I'm
not against a loan in the general per se, just against a taxpayer-
subsidised and guaranteed one, especially given the site's history of
financial imploding.


The Nine Elms and Battersea developments aren't just about the power
station site, which has been undeveloped through at least two boom and
bust cycles.
--
Phil Cook
  #8   Report Post  
Old December 7th 12, 07:34 PM posted to uk.transport.london,misc.transport.urban-transit,uk.railway
external usenet poster
 
First recorded activity at LondonBanter: Apr 2012
Posts: 150
Default London Battersea Northern Line extension now done with a loan?

On 7 Dec, 09:54, Jamie Thompson wrote:
A role which previously the North London line filled. *The Jubilee
Line is an expensive replacement. *By now the North London Line to
Docklands would have been an Overground Link.


The North London Line in that part of town was okay if you wanted to go to
north London and if you could bear the infrequent service it was fine for
Silvertown and North Woolwich. But it was utterly useless for getting from
Stratford/West Ham/Canning Town to places south of the river. The
development in the docks was not adequately served - even three car DLR
trains are still slow (and the Waterloo & City heaving at the other end) and
no great substitute for a proper tube lin to the centre.


Which is why I believe the NLL needed to be diverted from Silvertown
and North Woolwich, and instead run under the Thames to an interchange
with the Dartford lines. *There would nothing to prevent an
interchange staion with a Jubilee route to Thamesmead.


In my eyes, the ideal situation given hindsight would have been for
the NLL's Poplar branch to have been renovated and tunnelled under the
river as the DLR was and linked to a rebuilt Greenwich Park branch,
which would then run through to Clapham Junction via Peckham Rye.
Likewise, there would have been little need to wait for Crossrail to
run from North Woolwich to Abbey Wood had the NLL been extended the
same way, with a service from the North Kent line running via Canning
Town and Stratford to the Goblin at South Tottenham, thence onward to
Willesden Junction and Richmond.

Given the demand between Stratford and Canary Wharf I believe a grade-
separated curve linking the two Crossrail branches would serve this
demand far better than the Jubilee line does, and it would enable more
use to be made of the capacity on the two branches (i.e. every train
to Canary Wharf from Whitechapel is a train to Shenfield that has to
use up capacity at Liverpool Street). Accordingly, the Jubilee could
then have it's branch to Thamesmead, with the DLR running alongside
the NLL up to Stratford.

...swinging back on topic, the Northern Line extension to Battersea
couldn't be more of a pig's ear if they tried, and funding it with a
loan is disgraceful. The capacity of the CX branch should be used to
extend south east, e.g. down to Crystal Palace via Loughborough
Junction, Herne Hill et. al. en route to the Hayes branch. A major
redevelopment of the drain (including lengthening the existing Bank
platforms to 8 car length and building new ones at Waterloo) would be
the ideal way to serve the Battersea area, with stations at Bank,
Blackfriars, Waterloo, Lambeth, Vauxhall, Nine Elms, Battersea Park,
Battersea High Street and Clapham Junction, with depot facilities
provided by London Road (the Bakerloo getting a new depot on its own
southern extension.)

Even if you accept that the drain proposal above is dependant on the
Bakerloo works to free up London Road, then simply building Clapham
Junction to Vauxhall then linking to Kennington is the way to do
things for the time being so you can just reuse the infrastructure
later in doing things properly. Likewise, the reasons given for not
interchanging with Vauxhall are bunk of the highest order. Routing the
line as required and hollowing out the platform tunnels is all that is
needed for passive provision until Crossrail 2 relieves the Victoria
line enough to permit the interchange being brought into use.


Excellent thinking sir. I cannot fault it.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Northern Line to Battersea Power Station 77002 London Transport 11 December 29th 11 09:07 AM
Northern Line Extension To Battersea Paul London Transport 7 May 24th 11 06:36 PM
Northern line to battersea [email protected] London Transport 3 February 23rd 11 12:32 PM
Who owns the CC western extension cameras and poles, and what will be done with them? John Rowland London Transport 5 January 5th 09 09:46 AM
Sleepless ? ? Need a Loan ?? flyawayteeks London Transport 0 October 18th 06 05:27 AM


All times are GMT. The time now is 04:43 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017