Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]()
In message , at 21:11:22 on
Wed, 24 Sep 2014, Paul Corfield remarked: Introducing the "Night Tube" does raise the issue of what happens if there is planned engineering work. Do we get "night tube replacement bus services"? Or they could do the work on Sun-Thu nights only. And it would take rather long than if every night was available - Yes, but we have to assume they've done their sums. In particular why this new initiative is only possible after a whole year of normal/ current timetabling. especially Sat to Sun which is the longest break in service because of the later Sunday start times. The SSR resignalling is already up against it in terms of time. In order to save face I imagine LU will want maximum productivity on multiple sites every night of the week (assuming no clashes). For serious stuff they could close it all day Sunday (from 4am anyway), as they do already. Serious stuff needs 52 hours, sometimes longer. This is why you get Friday night to Monday morning closures. These could still take place. I don't think they've announced that "night tubes" will be any more uninterruptable than the current ones. -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
The Jubilee Line Night Tube started last night, with Northern onNovember 18 | London Transport | |||
Borders Railway (Edinburgh - Tweedbank) opening Sun 6 Sep 2015 | London Transport | |||
Proposal - every Tube ticket office to close by 2015 | London Transport | |||
Barclays Boris bikes sponsorship to end in 2015 | London Transport |