Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]()
In message , at 11:01:47 on
Thu, 2 Oct 2014, Paul Corfield remarked: A train failure at Tottenham Court Road before 0700 resulted in no Central Line service between Liverpool Street and Marble Arch until about noon. Alternative reports of emergency engineering works made me guess the failed train hit something. Loss of the Central line seemed to overload the westbound Jubilee. I boarded the fourth arriving train at London Bridge about 0830. ;( I suppose the day continued in kind. ![]() The failure rate seems much lower than it was about 5 years ago. Double failures are now rare. 40% delay improvement claims seem pessimistic. ![]() It is reported on the District Dave blog that an engineering hours move of the preserved Cravens unit (back from the EOR) resulted in damage to the conductor rail. The first service train had several of its shoes knocked off by the misaligned track. That train was then stranded. Getting the train out of the way and then repairing the conductor rail is what took the time. Not the first time this sort of thing has happened (i.e. damaged conductor rail knocking current shoes off trains). Doesn't bode well for future moves for the Cravens unit. I wonder who will get the bill for that episode? -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
October half-term - 50% off all SWT off-peak day returns! | London Transport | |||
"Delivering a Modern European Railway for 21st Century Ireland" -with Dick Fearn 15th October 19 00 hours | London Transport | |||
Croxley Rail Link - Position Update October 2007 | London Transport | |||
Manufacturing Gateway Gothenburg, Sweden. 19-21 October 2007 | London Transport | |||
Lock And Key Party- LONDON- 20th October | London Transport |