London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Old April 30th 15, 08:18 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2013
Posts: 704
Default ELL closed

Apparently the ELL was closed all the way from Highbury down to clapham this
morning because of a fire at new cross. Did they not think to install
reversing crossovers at various points on the line or could they simply not
be bothered to run a service on the rather crucial Highbury - Canada Water
section? What a shambles they are.

--
Spud

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hammersmith flyover closed for three weeks from Aug 1st Oliver Keating London Transport 8 July 21st 03 02:21 PM
Marylebone Tube Closed Morning Rush Hour CJG London Transport 11 July 17th 03 09:19 PM
Hammersmith flyover closed for three weeks from Aug 1st AstraVanMan London Transport 0 July 13th 03 09:11 AM
Hammersmith flyover closed for three weeks from Aug 1st kedron London Transport 0 July 12th 03 11:27 PM
Hammersmith flyover closed for three weeks from Aug 1st Oliver Keating London Transport 0 July 12th 03 10:12 PM


All times are GMT. The time now is 06:01 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017