So reports BBC:
http://www.bbc.co.uk/news/uk-england-london-33002819

"Tunnelling work in London has been completed in the £14.8bn Crossrail
scheme.
Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."

  #2   Report Post  
Old June 4th 15, 09:06 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail tunneling complete

In message , at 09:43:10 on Thu, 4 Jun 2015,
Jim Chisholm remarked:

Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."


That's the new tunnels, plus the exciting machines which re-did the
kilometre of Connaught tunnel.
--
Roland Perry
  #3   Report Post  
Old June 4th 15, 10:00 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2010
Posts: 38
Default Crossrail tunneling complete

On 04/06/2015 10:06, Roland Perry wrote:
In message , at 09:43:10 on Thu, 4 Jun 2015,
Jim Chisholm remarked:

Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."


That's the new tunnels, plus the exciting machines which re-did the
kilometre of Connaught tunnel.

And isn't it a shame that these boring machines and their expert
workforce cannot now move directly to start CROSSRAIL2?
  #4   Report Post  
Old June 4th 15, 10:52 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail tunneling complete

On Thu, 04 Jun 2015 11:00:36 +0100, Jim Chisholm
wrote:

On 04/06/2015 10:06, Roland Perry wrote:
In message , at 09:43:10 on Thu, 4 Jun 2015,
Jim Chisholm remarked:

Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."


That's the new tunnels, plus the exciting machines which re-did the
kilometre of Connaught tunnel.

And isn't it a shame that these boring machines and their expert
workforce cannot now move directly to start CROSSRAIL2?


Yes, but HS2 may need the workforce in between. The HS2 tunnels will
be bigger, so not the same TBMs.
  #5   Report Post  
Old June 4th 15, 11:15 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail tunneling complete

In message , at 11:00:36 on Thu, 4 Jun 2015,
Jim Chisholm remarked:
Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."


That's the new tunnels, plus the exciting machines which re-did the
kilometre of Connaught tunnel.

And isn't it a shame that these boring machines and their expert
workforce cannot now move directly to start CROSSRAIL2?


Not really, much of them will be worn out, and it's a real issue getting
them out of the ground. They'll salvage any useful bits they can for the
manufacturer to reuse wherever the next *funded* project is about the
start tunnelling (which isn't Crossrail 2).
--
Roland Perry


  #6   Report Post  
Old June 4th 15, 11:22 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2013
Posts: 704
Default Crossrail tunneling complete

On Thu, 04 Jun 2015 11:52:55 +0100
Recliner wrote:
On Thu, 04 Jun 2015 11:00:36 +0100, Jim Chisholm
wrote:

On 04/06/2015 10:06, Roland Perry wrote:
In message , at 09:43:10 on Thu, 4 Jun 2015,
Jim Chisholm remarked:

Eight boring machines have been cutting their way through earth to
create 26 miles (42km) of tunnels."

That's the new tunnels, plus the exciting machines which re-did the
kilometre of Connaught tunnel.

And isn't it a shame that these boring machines and their expert
workforce cannot now move directly to start CROSSRAIL2?


Yes, but HS2 may need the workforce in between. The HS2 tunnels will
be bigger, so not the same TBMs.


I thought the crossrail tunnels were also being built to UIC gauge?

--
Spud

  #8   Report Post  
Old June 4th 15, 01:30 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 64
Default Crossrail tunneling complete

Roland Perry wrote:

Not really, much of them will be worn out, and it's a real issue getting
them out of the ground.


Surprised they didn't just leave them like they did with the Chunnel TBMs.
  #9   Report Post  
Old June 4th 15, 01:41 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 309
Default Crossrail tunneling complete

On Thu, 4 Jun 2015 12:15:41 +0100, Roland Perry wrote:
Not really, much of them will be worn out, and it's a real issue getting
them out of the ground. They'll salvage any useful bits they can for the
manufacturer to reuse wherever the next *funded* project is about the
start tunnelling (which isn't Crossrail 2).


Is a TBM left buried in the ground subject to Landfill Tax?
  #10   Report Post  
Old June 4th 15, 02:39 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail tunneling complete

Arthur Conan Doyle wrote:
Roland Perry wrote:

Not really, much of them will be worn out, and it's a real issue getting
them out of the ground.


Surprised they didn't just leave them like they did with the Chunnel TBMs.


I think one cutter head has been abandoned at Farringdon (discussed at
length here a few months ago). The rest have been extricated and, I
believe, returned to Germany for refurbishment. I don't know how much of
these well-used, huge machines can be re-used.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail tunnelling complete e27002 aurora London Transport 17 June 9th 15 04:55 PM
Crossrail tunnelling complete e27002 aurora London Transport 23 June 8th 15 09:56 AM
Bob Crow is a Complete and Utter B*ST*RD! Barry Salter London Transport 58 September 7th 07 11:09 AM
A13 - Canning Town (new) Flyover virtually complete! Dr. Sunil London Transport 6 October 6th 03 07:04 PM


All times are GMT. The time now is 06:57 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017