Default Crossrail tunnelling complete

In message
-septem
ber.org, at 20:25:58 on Fri, 5 Jun 2015, Recliner
remarked:

Are you unaware of the 14tph reversing @ Westbourne Park?

I knew some would be reversing at Paddington, but with only 8tph from
each of the branches to the east, that only leaves 2tph which seems
too few.

There will be 24tph through the core but only 10 will continue past
Paddington.


Where are they starting from?


In the peak, 12 each per hour from both eastern branches. Of these, ten
proceed beyond Paddington.
Off peak, six from Shenfield, eight from Abbey Wood. Six proceed beyond
Paddington.


The tourist demand to Windsor would be off-peak, so it would be
abstracting from the six-beyond-Paddington, which actually means none to
Maidenhead. Unless the "Orange" service was extended to all day and sent
to Windsor, replacing 2tph of the Paddington terminators. Which is quite
a big change to the pattern.
--
Roland Perry
  #19   Report Post  
Old June 6th 15, 07:21 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail tunnelling complete

In message
-septem
ber.org, at 23:36:37 on Fri, 5 Jun 2015, Recliner
remarked:
My impression is that Abbey Wood has 8tph and they hope Shenfield
will also have 8tph despite only currently having permission to do
6tph.


Those are off-peak figures I think. There are only 16 through the core then.


See my post upthread: 14 tph off-peak, 24 peak.


Crossrail are hoping to run 8tph offpeak from Shenfield, despite
currently only having permission to run six.
--
Roland Perry
  #20   Report Post  
Old June 7th 15, 12:18 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail tunnelling complete

On Sat, 6 Jun 2015 08:21:50 +0100, Roland Perry
wrote:

In message
-septem
ber.org, at 23:36:37 on Fri, 5 Jun 2015, Recliner
remarked:
My impression is that Abbey Wood has 8tph and they hope Shenfield
will also have 8tph despite only currently having permission to do
6tph.

Those are off-peak figures I think. There are only 16 through the core then.


See my post upthread: 14 tph off-peak, 24 peak.


Crossrail are hoping to run 8tph offpeak from Shenfield, despite
currently only having permission to run six.


As Crossrail will be the main (only?) operator on the slow lines to
Shenfield, who is it that is limiting the service?


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail tunnelling complete e27002 aurora London Transport 17 June 9th 15 04:55 PM
Crossrail tunneling complete Jim Chisholm London Transport 24 June 4th 15 09:56 PM
Crossrail tunnelling pictures Recliner[_2_] London Transport 3 February 28th 13 07:28 PM
Crossrail tunnelling to start shortly Mizter T London Transport 211 April 13th 12 12:06 AM
Crossrail tunnelling to start shortly 77002 London Transport 1 March 25th 12 09:24 PM


All times are GMT. The time now is 12:55 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017