London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #21   Report Post  
Old June 7th 15, 01:45 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail tunnelling complete

In message , at 13:18:31 on
Sun, 7 Jun 2015, Recliner remarked:
Crossrail are hoping to run 8tph offpeak from Shenfield, despite
currently only having permission to run six.


As Crossrail will be the main (only?) operator on the slow lines to
Shenfield, who is it that is limiting the service?


ORR.
--
Roland Perry

  #22   Report Post  
Old June 7th 15, 02:48 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default Crossrail tunnelling complete

Roland Perry wrote:
In message , at 13:18:31 on
Sun, 7 Jun 2015, Recliner remarked:
Crossrail are hoping to run 8tph offpeak from Shenfield, despite
currently only having permission to run six.


As Crossrail will be the main (only?) operator on the slow lines to
Shenfield, who is it that is limiting the service?


ORR.


Who else is competing to use the line?
  #23   Report Post  
Old June 8th 15, 07:18 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail tunnelling complete

In message
-septem
ber.org, at 14:48:38 on Sun, 7 Jun 2015, Recliner
remarked:
Crossrail are hoping to run 8tph offpeak from Shenfield, despite
currently only having permission to run six.

As Crossrail will be the main (only?) operator on the slow lines to
Shenfield, who is it that is limiting the service?


ORR.


Who else is competing to use the line?


The Greater Anglia franchise holder is running trains to Southend,
Braintree etc. They are fast to Shenfield though. The ORR's stance may
be aimed more at having a 10-minute clockface timetable and reducing the
subsidy if they think 6tph is adequate for the passenger numbers.
--
Roland Perry


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail tunnelling complete e27002 aurora London Transport 17 June 9th 15 04:55 PM
Crossrail tunneling complete Jim Chisholm London Transport 24 June 4th 15 09:56 PM
Crossrail tunnelling pictures Recliner[_2_] London Transport 3 February 28th 13 07:28 PM
Crossrail tunnelling to start shortly Mizter T London Transport 211 April 13th 12 12:06 AM
Crossrail tunnelling to start shortly 77002 London Transport 1 March 25th 12 09:24 PM


All times are GMT. The time now is 03:12 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017