London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #2   Report Post  
Old June 5th 15, 08:53 AM posted to uk.railway,misc.transport.urban-transit,uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default Crossrail tunnelling complete

In message , at 09:14:39 on
Fri, 5 Jun 2015, e27002 aurora remarked:
Given the cost of the project, it seems a shame that if they want to
provide a service for Windsor they couldn't have built a tunnel at
Slough and actually gone to Windsor. But I don't understand why they
don't turn at Slough... is the bay platform gone?


Agreed, omitting the Windsor branch was an error.


Is Windsor station long enough, and are you happy to reduce the service
frequency west of Slough as a result?
--
Roland Perry
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Crossrail tunnelling complete e27002 aurora London Transport 17 June 9th 15 04:55 PM
Crossrail tunneling complete Jim Chisholm London Transport 24 June 4th 15 09:56 PM
Crossrail tunnelling pictures Recliner[_2_] London Transport 3 February 28th 13 07:28 PM
Crossrail tunnelling to start shortly Mizter T London Transport 211 April 13th 12 12:06 AM
Crossrail tunnelling to start shortly 77002 London Transport 1 March 25th 12 09:24 PM


All times are GMT. The time now is 10:56 PM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017