London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #31   Report Post  
Old May 22nd 16, 03:14 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2009
Posts: 1,484
Default 08.08 To Willesden Junction

Very interesting to learn about the 8.08.

Do or have any trains in revenue service run between Upper Holloway and
Thameslink lines via Junction Road Junction since 1981?

Has anything ever run that way for engineering works, in the same manner
that the NLL has travelled via Primrose Hill?




  #33   Report Post  
Old May 22nd 16, 10:10 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
external usenet poster
 
First recorded activity at LondonBanter: Sep 2012
Posts: 498
Default 08.08 To Willesden Junction

On Sun, 22 May 2016 14:17:14 -0000 (UTC), Recliner
wrote:

Basil Jet wrote:
On 2016\05\22 12:34, Graeme Wall wrote:
On 22/05/2016 11:46, e27002 aurora wrote:

How easy would it be to convert the bay, at Gospel Oak, into a thru
platform? When electrification is complete a thru service could be
useful.

There's physically space to convert it to a *through* platform. The
pointwork to the west may need altering to allow east bound trains to
access the platform.


Just the one through platform for both directions? (Yes, I know Ware
Station is like that.)

Are there paths for the full Goblin service to extend westward? Is there
need for that many trains westward? Although it would be "neat" if the
full Goblin service went to Clapham Junction and the full Stratford
service went to Richmond.


One minor point, but the new GOBLIN trains will be four-car Aventras,
rather than the five-car 378s used on the NLL. Wasting a scarce NLL path on
a four-car unit wouldn't go down well.

They "waste" a path on a 2 or 4 coach DMU to Willesden Junction every
weekday morning; I suspect the passengers see it as a relief rather
than a nuisance.
  #35   Report Post  
Old May 22nd 16, 11:17 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default 08.08 To Willesden Junction

In article ,
(Charles Ellson) wrote:

On Sun, 22 May 2016 14:17:14 -0000 (UTC), Recliner
wrote:

Basil Jet wrote:
On 2016\05\22 12:34, Graeme Wall wrote:
On 22/05/2016 11:46, e27002 aurora wrote:

How easy would it be to convert the bay, at Gospel Oak, into a thru
platform? When electrification is complete a thru service could be
useful.

There's physically space to convert it to a *through* platform. The
pointwork to the west may need altering to allow east bound trains to
access the platform.

Just the one through platform for both directions? (Yes, I know Ware
Station is like that.)

Are there paths for the full Goblin service to extend westward? Is
there need for that many trains westward? Although it would be "neat"
if the full Goblin service went to Clapham Junction and the full
Stratford service went to Richmond.


One minor point, but the new GOBLIN trains will be four-car Aventras,
rather than the five-car 378s used on the NLL. Wasting a scarce NLL path
on a four-car unit wouldn't go down well.

They "waste" a path on a 2 or 4 coach DMU to Willesden Junction every
weekday morning; I suspect the passengers see it as a relief rather
than a nuisance.


It is one train (presumably fitted between freight paths) rather than a
regular service which would be quite a different timetabling challenge.

--
Colin Rosenstiel


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
0759 Woodgrange Park to Willesden Junction LL Ken Wheatley London Transport 6 April 2nd 14 12:51 PM
TfL box in Willesden Church End Basil Jet London Transport 2 July 14th 09 11:45 AM
Willesden- Clapham Junction Eric London Transport 15 May 18th 07 07:24 AM
Willesden Junction rare-ish track open today John Rowland London Transport 14 July 16th 04 08:24 PM
Lost Willesden Railway Stations CharlesPottins London Transport 0 December 18th 03 03:51 PM


All times are GMT. The time now is 06:29 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017