Default Barking Riverside Extension approved


I wonder if Network Rail agree about the feasibility of 6 passenger
trains and 6 freight trains an hour. (Mind you, I've never seen any
evidence that there's a need for 6 freight paths an hour!)

I don't know how likely a cross Thames extension is, but I hope
it won't require much demolition of newly created infrastructure.


Don't know if NR agree or not. The operation of extra trains would require an extra freight passing loop - that's in the inspector's report. I think past NR documents have said that signalling mods would also be needed to run an enhanced frequency. However this isn't mentioned in the inspector's report.

TfL told the inquiry that it will likely be the 2030s before a cross river link could be contemplated or afforded. A cost of £1.2-£1.8bn is cited. One objector went to great lengths to try to discredit the elevated design as it would need to be demolished and replaced with a descending tunnel alignment and sub surface station if the link to Abbey Wood is built. The objections were rejected because forcing TfL to build a tunnelled link now was not in the current project scope / design, not funded and not within the pervue of the inquiry. The inspector said that if the elevated link eventually had to be demonlished then it would not be money wasted given that providing the link would have enabled the building of 10,500 new homes.

--
Paul C
via Google
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
A foot and cycle bridge across Barking Creek as part of the DLRDagenham Dock extension? Tom Anderson London Transport 16 December 5th 08 05:52 PM
Piccadilly line extension to Terminal 5/Heathrow Express extension to T5 Martin Whelton London Transport 43 May 27th 04 08:40 AM
Crossrail funding approved Matthew Malthouse London Transport 25 July 27th 03 12:02 PM


All times are GMT. The time now is 06:34 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017