Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.

Likwise does any news exist on the Heathrow Express extension.

Martin

  #2   Report Post  
Old May 17th 04, 09:38 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 627
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.

Plans are advanced for the closure of the T4 loop to allow the T5
extension to be connected. I think the latest plan is around December.
I'll try and confirm today at work, but I think we're looking at about a
two year closure.
--
Steve Fitzgerald has now left the building.
You will find him in London's Docklands, E16, UK
(please use the reply to address for email)
  #3   Report Post  
Old May 17th 04, 03:35 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

Steve Fitzgerald ] wrote in message ...
In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.


Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?

B2003
  #4   Report Post  
Old May 17th 04, 03:39 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

Steve Fitzgerald ] wrote in message ...
In message , Martin
Whelton writes
Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.


Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?

B2003
  #5   Report Post  
Old May 17th 04, 09:31 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 627
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5

In message , Boltar
writes

Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?


Absolutely no idea, we've not been given that detail.
--
Steve Fitzgerald has now left the building.
You will find him in London's Docklands, E16, UK
(please use the reply to address for email)


  #6   Report Post  
Old May 17th 04, 09:54 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,158
Default Piccadilly line extension to Terminal 5/Heathrow Express extensionto T5

Boltar wrote:
Steve Fitzgerald ] wrote in message ...

In message , Martin
Whelton writes

Do we know when construction work is due to start on the Piccadilly
extension to Terminal 5 as I understand that tunneling work was due to
be finished by next year. I also understand that Terminal 4 would be
temporaily closed during the construction period.


Tunnelling is well under way and I believe the station box is all but
finished.



Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?

B2003


I doubt there will be PEDs as Jubilee drivers had to receive special
training for theirs - there's not much point having to train all
Piccadilly drivers to do this for just one station. There may be some
technical issues too but I'm not sure about those.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London
  #7   Report Post  
Old May 19th 04, 12:42 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 94
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5


"Steve Fitzgerald" ] wrote in message
...
In message , Boltar
writes

Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?


Absolutely no idea, we've not been given that detail.



Has there been a consensus regarding how it will be rendered on the map yet?

If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then the
diagram will need to resemble a pair of testicles at the end of the line,
no?

BTN


  #8   Report Post  
Old May 19th 04, 12:44 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 125
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5


"Ben Nunn" wrote in message
...

"Steve Fitzgerald" ] wrote in message
...
In message , Boltar
writes

Will the station be in the JLE style with platform doors or will it be
like T123 & Hatton Cross?


Absolutely no idea, we've not been given that detail.



Has there been a consensus regarding how it will be rendered on the map

yet?

If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then the
diagram will need to resemble a pair of testicles at the end of the line,
no?


T5 will not be on a loop. Some trains will go HX-T4-T123-HX as now and the
others will go HX-T123-T5(reverse)-T123-HX

Peter Smyth


  #9   Report Post  
Old May 19th 04, 09:34 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 18
Default Piccadilly line extension to Terminal 5/Heathrow Expressextension to T5

Once upon a time -- around about 5/19/04 08:42 --
possibly wrote:

diagram will need to resemble a pair of testicles at the end of the line,
no?

I will thank you not to do that again. I laughed so hard I got water all
over my keyboard. I'm very cross with you right now.

-- E

--
Frodo Baggins' New Year's Resolution "To ditch the bloody ring. And get
laid." (A London Times article by James Morgan 12-31-02)

  #10   Report Post  
Old May 20th 04, 12:01 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 94
Default Piccadilly line extension to Terminal 5/Heathrow Express extension to T5


"Peter Smyth" wrote in message
...

If one loop goes HX-T4-T123-HX and the other goes HX-T123-T5-HX, then

the
diagram will need to resemble a pair of testicles at the end of the

line,
no?


T5 will not be on a loop. Some trains will go HX-T4-T123-HX as now and the
others will go HX-T123-T5(reverse)-T123-HX



So how will that work with the two platforms at T123? Will one be used
exclusively for London-bound trains that have gone round the loop, and the
other for bi-directional trains on a single track extension to T5?

Or will it be one platform be for T5 only, and the other for both sets of
London-bound trains? (which would make more sense to the traveller, but be
logistically more difficult to implement, and result in a bizarre station
where twice as many trains went in one direction as t'other.)

BTN




Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Heathrow to dover cruise terminal [email protected] London Transport 11 July 27th 07 11:02 PM
South Kensington to Heathrow Terminal 3 on Tuesday David of Broadway London Transport 29 October 29th 06 03:08 PM
Heathrow's Terminal " to be demolished Anon London Transport 0 November 13th 05 07:01 PM
Walking from Heathrow Terminal 4 Mark London Transport 3 June 26th 04 09:34 PM
Stansted Express Train - Express ride to a missed flight Mike Delorme London Transport 8 February 28th 04 05:42 PM


All times are GMT. The time now is 07:54 AM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017