London Transport (uk.transport.london) Discussion of all forms of transport in London.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old November 25th 17, 09:17 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Sep 2008
Posts: 4,877
Default Completion of London's Thameslink rail project delayed until

In article , (Roland Perry)
wrote:

In message , at
09:47:06 on Fri, 24 Nov 2017,
remarked:

with 5 times as many cars, travelling 5 times as many miles, I find
it neither surprising nor wholly reprehensible that people are no
longer content to wait for the signalman to change the signals, then
come down from the box to open the gates. And those figures are
national. In London and the SE the changes have been greater.


That level crossing model, while normal in the 1960s, largely went out
long ago. So signalling is as likely as not automatic or controlled by
route setting. 5 crossings are supervised from Cambridge PSB by CCTV.
Almost no crossing gates require a signalman to come down from his box to
open the gates now.


Littleport station crossing!


With an underpass like at Ely! How much traffic does that crossing get?
Again, the signalling to King's Lynn is long overdue for modernising. It
should have been done with the electrification. Why that crossing missed out
on replacement of gates by lifting barriers GOK. Part of the decades of
under-investment because of cutting taxes on motorists.

OK, I was a bit too strong with "almost no" but I'm not aware of any others
in East Anglia.

And until only a couple of years ago, Shippea Hill station crossing.


Yes, Ely-Norwich signalling was modernised.

--
Colin Rosenstiel
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Rail upgrades delayed Chris J Dixon London Transport 1 July 22nd 15 08:08 AM
Rail upgrades delayed [email protected] London Transport 2 June 25th 15 09:57 PM
Croxley Rail Link: London Underground could take over construction of £230m project [email protected] London Transport 7 December 19th 14 07:40 PM
Thameslink project (i.e. TL2K) gets legal & planning go-ahead Mizter T London Transport 19 October 21st 06 12:01 AM
Exciting news on Thameslink 2000 (now "Thameslink Project") [email protected] London Transport 5 May 5th 06 07:45 PM


All times are GMT. The time now is 07:13 AM.

Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017