London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #21   Report Post  
Old May 31st 18, 08:20 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default New tube map has mistake

Roland Perry wrote:
In message
-sept
ember.org, at 23:28:08 on Wed, 30 May 2018, Recliner
remarked:

http://www.railwaygazette.com/news/s...o-takeoff.html

"Because Heathrow Connect services will not be advertised as through trains and
will always be overtaken en route, Murphy believes most London - Heathrow
passengers will continue to use the fast trains. There will be no through
tickets other than the full Heathrow Express fares."


Thanks, that's an interesting article from 14 years ago. It's an
interesting reminder of how projects slip even when they're not notoriously
delayed:

"In the longer term, Heathrow Connect may be absorbed by Crossrail Line 1,
which plans to operate four trains/h into Heathrow Airport from around
2014. BAA Rail is also pushing ahead with the Airtrack project to extend
the Terminal 5 branch to carry local services to and from the southwest
suburbs."

So the full Crossrail 1 will finally run to Heathrow more than five years
later than was expected back in 2004, and Airtrack is still no more than a
(renamed) concept, with no possibility of opening before 2030.


BAA was issuing maps in 1998 showing Heathrow Express to St Pancras [via
West Hampstead] "From 2001", plus undated Airtrack and the western link
to GWML.

London Underground in 1995, were claiming St Pancras would open for
Channel Tunnel traffic in 2002 and the Jubilee Line extension to
Stratford by 1998.


That was close: it opened in 1999.

Crossrail was "planned" (no date given). Other
projects included the Croxley Rail link, the East London Line Extension
(finally opened in 2010), and the least delayed item the Heathrow T5
station, opened in 2008 versus a predicted 2003.


At least it opened along with the terminal.


  #22   Report Post  
Old May 31st 18, 08:44 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Feb 2016
Posts: 1,071
Default New tube map has mistake



"Roland Perry" wrote in message
...
In message plbugd5l9bn063hcp5efr64251h2eoor4q@None, at 17:09:24 on Wed,
30 May 2018, Arthur Conan Doyle remarked:
Roland Perry wrote:


You'd probably have to look for Heathrow Airport strategic travel plans.


This article is quite dated, and I'm not sure the detail about fares is
still
valid, but it does show there was intent to protect HX.


With respect to airline passengers. That leaves airport workers (who get
subsidised fares too).


Surely the point about airport workers is that they are going to be making a
journey from one of the local stations

Almost none of them are going to be doing a journey for which a fast service
from Padd is helpful

tim



  #23   Report Post  
Old May 31st 18, 09:52 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default New tube map has mistake

In message
-sept
ember.org, at 08:20:54 on Thu, 31 May 2018, Recliner
remarked:

London Underground in 1995, were claiming St Pancras would open for
Channel Tunnel traffic in 2002 and the Jubilee Line extension to
Stratford by 1998.


That was close: it opened in 1999.


"Construction officially started in December 1993, expected to take
53 months [#8, which is Hansard June 1993]." (Wikipedia)

1/1/93+53mths = Jun97; thus I suspect the "by 1998" above was an attempt
to convey "might slip to the end of 1997".

I'll give the benefit of the doubt to Wikipedia that subsequent dates
quoted are a correct reflection of the cites...

"By November 1997 a September 1998 date was planned.[10] By June 1998,
opening was planned in Spring 1999.[11] By November 1998, a phased
opening, previously rejected, was being considered, with Stratford to
North Greenwich planned for spring 1999, to Waterloo for summer 1999,
and the link to the Jubilee line for autumn 1999.[12][13] This scheme
was followed, with the first phase opening on 14 May 1999, the second on
24 September, and the third on 20 November. Westminster, complicated by
the interface with the subsurface platforms, which remained in
operation, opened on 22 December 1999, shortly before the Millennium
Dome deadline".

So yes, a gentle slide, rather than a major calamity.
--
Roland Perry
  #24   Report Post  
Old May 31st 18, 10:17 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default New tube map has mistake

Roland Perry wrote:
In message
-sept
ember.org, at 08:20:54 on Thu, 31 May 2018, Recliner
remarked:

London Underground in 1995, were claiming St Pancras would open for
Channel Tunnel traffic in 2002 and the Jubilee Line extension to
Stratford by 1998.


That was close: it opened in 1999.


"Construction officially started in December 1993, expected to take
53 months [#8, which is Hansard June 1993]." (Wikipedia)

1/1/93+53mths = Jun97; thus I suspect the "by 1998" above was an attempt
to convey "might slip to the end of 1997".


Er, Dec 1993 isn't 1/1/93. 53 months after Dec 1993 would be April 1998.


I'll give the benefit of the doubt to Wikipedia that subsequent dates
quoted are a correct reflection of the cites...

"By November 1997 a September 1998 date was planned.[10] By June 1998,
opening was planned in Spring 1999.[11] By November 1998, a phased
opening, previously rejected, was being considered, with Stratford to
North Greenwich planned for spring 1999, to Waterloo for summer 1999,
and the link to the Jubilee line for autumn 1999.[12][13] This scheme
was followed, with the first phase opening on 14 May 1999, the second on
24 September, and the third on 20 November. Westminster, complicated by
the interface with the subsurface platforms, which remained in
operation, opened on 22 December 1999, shortly before the Millennium
Dome deadline".

So yes, a gentle slide, rather than a major calamity.



The bigger slippage was the signalling. The originally planned moving block
signalling had to be hurriedly replaced by conventional signalling so as to
get the extension open during 1999, just in time for the hard deadline of
the midnight party in the big tent.

In fact, they only got the moving block signalling working in mid 2011,
just before the next hard deadline of the London Olympics:

http://www.risktec.tuv.com/knowledge-bank/technical-articles/sending-the-right-signals---new-signalling-technology-for-the-jubilee-line.aspx
  #25   Report Post  
Old May 31st 18, 10:59 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default New tube map has mistake

In message
-sept
ember.org, at 10:17:43 on Thu, 31 May 2018, Recliner
remarked:
Roland Perry wrote:
In message
-sept
ember.org, at 08:20:54 on Thu, 31 May 2018, Recliner
remarked:

London Underground in 1995, were claiming St Pancras would open for
Channel Tunnel traffic in 2002 and the Jubilee Line extension to
Stratford by 1998.

That was close: it opened in 1999.


"Construction officially started in December 1993, expected to take
53 months [#8, which is Hansard June 1993]." (Wikipedia)

1/1/93+53mths = Jun97; thus I suspect the "by 1998" above was an attempt
to convey "might slip to the end of 1997".


Er, Dec 1993 isn't 1/1/93. 53 months after Dec 1993 would be April 1998.


True, I really meant 1/1/94 (I doubt they did much over the Xmas break),
so we appear to have converged on "by the end of Q2 1998".

I'll give the benefit of the doubt to Wikipedia that subsequent dates
quoted are a correct reflection of the cites...

"By November 1997 a September 1998 date was planned.[10] By June 1998,
opening was planned in Spring 1999.[11] By November 1998, a phased
opening, previously rejected, was being considered, with Stratford to
North Greenwich planned for spring 1999, to Waterloo for summer 1999,
and the link to the Jubilee line for autumn 1999.[12][13] This scheme
was followed, with the first phase opening on 14 May 1999, the second on
24 September, and the third on 20 November. Westminster, complicated by
the interface with the subsurface platforms, which remained in
operation, opened on 22 December 1999, shortly before the Millennium
Dome deadline".

So yes, a gentle slide, rather than a major calamity.


The bigger slippage was the signalling. The originally planned moving block


Biggest cause of the slippage, perhaps, but every project will have one
of those, and it's failing to allow for that inevitability which is the
downfall of most such early predictions.
--
Roland Perry


  #26   Report Post  
Old November 20th 18, 05:55 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2018
Posts: 2
Default New tube map has mistake


CALL OR TEXT or watsapp ....+17546663823
Wickr id............budsman35
Email

hello we are leading suppliers of pharmaceutical product meds online we operate on daily and retails basis and very reliable and our product are 100% top quality am ready to supply on large and smaller orders and i am looking in building a strong business relationship with potential client around the world i do world wide delivery and delivery is guarantee.
see price list offer and pm me or you can get me on whatsapp

FOR ZOLPICLONE 7.5MG SMALLER ORDER
250 tabs..........................‎£90
500 tabs...........................‎£150
1000 tabs.........................‎£250
2500 tabs.........................£350
5000 tabs.........................£500
7500 tabs.........................£700
10000 tabs........................£850
15000 tabs........................£1200
25000 tabs........................£1500

FOR DIAZEPAM SHALINA BRAND
diazepam 10mg 500pills £100
diazepam 10mg 300pills £70
diazepam 10mg 1000pills £150
diazepam 10mg 5000pills £350
diazepam 5mg 1000pills £120
diazepam 5mg 5000pills £300
diazepam 5mg 10000pills £500
diazepam 10mg 10000pills £700

FOR ROCHE DIAZEPAMS 10MG SMALLER ORDER
250 tabs..........................‎£90
500 tabs...........................‎£150
1000 tabs.........................‎£250
2500 tabs.........................£350
5000 tabs.........................£500
7500 tabs.........................£700
10000 tabs........................£850
15000 tabs........................£1200
25000 tabs........................£1500

TEVA 10MG DIAZEPAMS SMALLER ORDER
250 tabs...........................‎£90
500 tabs...........................‎£150
1000 tabs.........................‎£250
2500 tabs.........................£350
5000 tabs.........................£500
7500 tabs.........................£700
10000 tabs.......................£850
15000 tabs.......................£1200
25000 tabs.......................£1500

Ketamine hcl liquid 50mg/10mg
5 bottles/vials..........$200
10 bottles/vials.........$300
15 bottles/vials.........$350
20 bottles/vials.........$400
25 bottles/vials.........$600
50 bottles/vials.........$800
75 bottles/vials.........$1000
100 bottles/vials.........$1500
150 bottles/vials.........$2000
200 bottles/vials.........$2500 ..
ketamine £20 each vial/1g
ketamine powder each gram £25

FOR TRAMADOL APPLE FLAVOUR
tramadol 50mg 250pills £80
tramadol 100mg 300pills £90
tramadol 225mg 300pills £120
tramadol 50mg 500pills £130
tramadol 100mg 500pills £140
tramadol 250mg 500pills £150
tramadol 50mg 1000pills £200
tramadol 100mg 1000pills £220
tramadol 250mg 1000pills £250

FOR TRAMADOL BULK ORDER
tramadol 50mg 5000pills £450
tramadol 100mg 5000pills £550
tramadol 250mg 5000pills £700

i also have my delivery records all around the worlds and i providedated pictures with buyers name and my name CALL US OR TEXT ....+17546663823 email for detailsi supply more than the quantity listed,i give additional discount to more larger ordersi look forward in doing great business with reliable buyersthanks email for details burdsman35

CALL OR TEXT or watsapp ....+17546663823
Wickr id............budsman35
Email :
  #27   Report Post  
Old December 11th 18, 11:40 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2018
Posts: 2
Default New tube map has mistake

Website..........https://www.tramax-shop.com/

Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/

Website.........https://www.tramax-shop.com/contact-us/

CALL OR TEXT or watsapp ....+15088120377

Email
WEBSITE.................https://www.tramax-shop.com/




hello we are leading suppliers of pharmaceutical product meds online we operate on daily and retails basis and very reliable and our product are 100% top quality am ready to supply on large and smaller orders and i am looking in building a strong business relationship with potential client around the world i do world wide delivery and delivery is guarantee.
see price list offer and pm me or you can get me on whatsapp
- show quoted text -
Ketamine hcl liquid 50mg/10mg
5 bottles/vials..........$200
10 bottles/vials.........$300
15 bottles/vials.........$350
20 bottles/vials.........$400
25 bottles/vials.........$600
50 bottles/vials.........$800
75 bottles/vials.........$1000
100 bottles/vials.........$1500
150 bottles/vials.........$2000
200 bottles/vials.........$2500 ..
ketamine £20 each vial/1g
ketamine powder each gram £25

FOR TRAMADOL APPLE FLAVOUR
tramadol 50mg 250pills £80
tramadol 100mg 300pills £90
tramadol 225mg 300pills £120
tramadol 50mg 500pills £130
tramadol 100mg 500pills £140
tramadol 250mg 500pills £150
tramadol 50mg 1000pills £200
tramadol 100mg 1000pills £220
tramadol 250mg 1000pills £250

FOR TRAMADOL BULK ORDER
tramadol 50mg 5000pills £450
tramadol 100mg 5000pills £550
tramadol 250mg 5000pills £700

i also have my delivery records all around the worlds and i providedated pictures with buyers name and my name CALL US OR TEXT ....+17546663823 email for detailsi supply more than the quantity listed,i give additional discount to more larger ordersi look forward in doing great business with reliable buyersthanks email for details CALL OR TEXT or watsapp ....+15088120377

Email



Website..........https://www.tramax-shop.com/

Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/

Website.........https://www.tramax-shop.com/contact-us/

CALL OR TEXT or watsapp ....+15088120377

Email
WEBSITE.................https://www.tramax-shop.com/
  #28   Report Post  
Old December 12th 18, 05:45 PM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Nov 2018
Posts: 2
Default New tube map has mistake

Website..........https://www.tramax-shop.com/

Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/

Website.........https://www.tramax-shop.com/contact-us/

CALL OR TEXT or watsapp ....+15088120377

Email
WEBSITE.................https://www.tramax-shop.com/




hello we are leading suppliers of pharmaceutical product meds online we operate on daily and retails basis and very reliable and our product are 100% top quality am ready to supply on large and smaller orders and i am looking in building a strong business relationship with potential client around the world i do world wide delivery and delivery is guarantee.
see price list offer and pm me or you can get me on whatsapp
- show quoted text -
Ketamine hcl liquid 50mg/10mg
5 bottles/vials..........$200
10 bottles/vials.........$300
15 bottles/vials.........$350
20 bottles/vials.........$400
25 bottles/vials.........$600
50 bottles/vials.........$800
75 bottles/vials.........$1000
100 bottles/vials.........$1500
150 bottles/vials.........$2000
200 bottles/vials.........$2500 ..
ketamine £20 each vial/1g
ketamine powder each gram £25

FOR TRAMADOL APPLE FLAVOUR
tramadol 50mg 250pills £80
tramadol 100mg 300pills £90
tramadol 225mg 300pills £120
tramadol 50mg 500pills £130
tramadol 100mg 500pills £140
tramadol 250mg 500pills £150
tramadol 50mg 1000pills £200
tramadol 100mg 1000pills £220
tramadol 250mg 1000pills £250

FOR TRAMADOL BULK ORDER
tramadol 50mg 5000pills £450
tramadol 100mg 5000pills £550
tramadol 250mg 5000pills £700

i also have my delivery records all around the worlds and i providedated pictures with buyers name and my name CALL US OR TEXT ....+17546663823 email for detailsi supply more than the quantity listed,i give additional discount to more larger ordersi look forward in doing great business with reliable buyersthanks email for details CALL OR TEXT or watsapp ....+15088120377

Email



Website..........https://www.tramax-shop.com/

Website,,,,,,,,,,https://www.tramax-shop.com/shipping-information/

Website.........https://www.tramax-shop.com/contact-us/

CALL OR TEXT or watsapp ....+15088120377

Email
WEBSITE.................https://www.tramax-shop.com/


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
New tube map, new London Connections, no timetables Basil Jet[_4_] London Transport 5 December 14th 16 04:16 PM
Another spelling mistake on the Tube Basil Jet[_4_] London Transport 74 January 30th 16 12:35 PM
Since the early twentieth century, the Bvlgari Company has been ableto present sophisticated and brilliantly crafted timepieces. It truly has beentheir contemporary design, the wholesomeness of their forms and the boldnessof the creativity that has g [email protected] London Transport 0 April 26th 08 06:40 PM
Since the early twentieth century, the Bvlgari Company has been ableto present sophisticated and brilliantly crafted timepieces. It truly has beentheir contemporary design, the wholesomeness of their forms and the boldnessof the creativity that has g [email protected] London Transport 0 April 26th 08 06:40 PM
His One Mistake Hiscoming London Transport 4 October 15th 04 11:38 PM


All times are GMT. The time now is 04:07 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017