London Transport (uk.transport.london) Discussion of all forms of transport in London.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #11   Report Post  
Old May 24th 19, 10:18 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: Oct 2014
Posts: 2,990
Default RIP GOBLIN temporary timetable?

wrote:
On Fri, 24 May 2019 09:54:53 -0000 (UTC)
Recliner wrote:
wrote:
On Thu, 23 May 2019 17:41:24 +0100
Recliner wrote:
On Thu, 23 May 2019 16:20:56 +0000 (UTC),
wrote:

On Thu, 23 May 2019 16:15:25 +0100
David Walters wrote:
On Thu, 23 May 2019 15:56:49 +0100, Ian Clifton


wrote:
The “Live departures & arrivals� pages on nationalrail.co.uk

seem to be

showing trains every 15 mins each way on the GOBLIN. TfL still says
“reduced service�, as far as I can see. Is it really

happening?

Yes, the first Class 710 in passenger service left Gospel Oak at 11:36.

Pictures in several places including

https://www.londonreconnections.com/...-class-710s-en
te
r-service/

No doubt at some point once the memory of the issues have faded somewhat,
little squirt Khan will hail this as a great success and hope nobody asks
exactly how many tens of millions extra from the TfL budget have been spent


getting these white elephants to work instead of just ordering some more

off
the shelf 378s which could have been running years ago.

The 378 EMUs must be more versatile than Bombardier ever claimed, to
be able to run on a non-electrified line. Or didn't you know that the
electrification was only completed a year ago?

Figure of speech.


In other words, you were ignorant.

They could have been running as soon as the wires went live.

And why do you assume that it's TfL's budget that is paying for
Bombardier's delays? Perhaps you could provide a reference for your
claim that, "tens of millions extra from the TfL budget have been
spent getting these white elephants to work"?

Cost of stabling, cost of driver training, cost of drivers doing nothing,

loss
of income from the line, cost of training for technical staff, cost of 710
specific depot equipment. I'm sure there's more but thats what came to mind

in
30 seconds.



Neil, yet again you demonstrate your ignorance of how the system works.
Please provide the cite I asked for.


Oh look, any minute Billy is going to claim the above didn't cost anything
and was all factored in , honest.



Of course both NR and Bombardier screwed up, big-time, on this project. But
you don't seem to have a clue about even basic things, such as who
maintains the LO fleet, and who will be paying compensation.


  #12   Report Post  
Old May 24th 19, 10:35 AM posted to uk.transport.london
external usenet poster
 
First recorded activity at LondonBanter: May 2019
Posts: 1
Default RIP GOBLIN temporary timetable?

On Fri, 24 May 2019 10:18:32 -0000 (UTC)
Recliner wrote:
wrote:
On Fri, 24 May 2019 09:54:53 -0000 (UTC)
Recliner wrote:
wrote:
On Thu, 23 May 2019 17:41:24 +0100
Recliner wrote:
On Thu, 23 May 2019 16:20:56 +0000 (UTC),
wrote:

On Thu, 23 May 2019 16:15:25 +0100
David Walters wrote:
On Thu, 23 May 2019 15:56:49 +0100, Ian Clifton

wrote:
The “Live departures & arrivals� pages on nationalrail.co.uk


seem to be

showing trains every 15 mins each way on the GOBLIN. TfL still says
“reduced service�, as far as I can see. Is it really
happening?

Yes, the first Class 710 in passenger service left Gospel Oak at 11:36.

Pictures in several places including


https://www.londonreconnections.com/...-class-710s-en
te
r-service/

No doubt at some point once the memory of the issues have faded

somewhat,
little squirt Khan will hail this as a great success and hope nobody asks


exactly how many tens of millions extra from the TfL budget have been

spent

getting these white elephants to work instead of just ordering some more
off
the shelf 378s which could have been running years ago.

The 378 EMUs must be more versatile than Bombardier ever claimed, to
be able to run on a non-electrified line. Or didn't you know that the
electrification was only completed a year ago?

Figure of speech.

In other words, you were ignorant.

They could have been running as soon as the wires went live.

And why do you assume that it's TfL's budget that is paying for
Bombardier's delays? Perhaps you could provide a reference for your
claim that, "tens of millions extra from the TfL budget have been
spent getting these white elephants to work"?

Cost of stabling, cost of driver training, cost of drivers doing nothing,
loss
of income from the line, cost of training for technical staff, cost of 710


specific depot equipment. I'm sure there's more but thats what came to mind


in
30 seconds.



Neil, yet again you demonstrate your ignorance of how the system works.
Please provide the cite I asked for.


Oh look, any minute Billy is going to claim the above didn't cost anything
and was all factored in , honest.



Of course both NR and Bombardier screwed up, big-time, on this project. But
you don't seem to have a clue about even basic things, such as who
maintains the LO fleet, and who will be paying compensation.


Unless bombadier are maintaining the fleet in perpituity out of their own
pocket then it'll ultimately come out of TfLs budget.



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Temporary closure of London Bridge Bus Station Robin9 London Transport 0 August 4th 11 03:33 PM
GOBLIN user group on new timetable Tim Roll-Pickering London Transport 15 April 7th 11 12:41 PM
St Pancras temporary platforms - whats their future? Boltar London Transport 6 November 23rd 07 10:00 AM
Oxford Street temporary pedestrianisation Joyce Whitchurch London Transport 2 December 3rd 06 10:52 PM
Bus stop sign covered and marked 'not in use' and a temporary bus stop sign right next to it Martin Rich London Transport 2 November 27th 03 08:52 PM


All times are GMT. The time now is 10:11 PM.

Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 London Banter.
The comments are property of their posters.
 

About Us

"It's about London Transport"

 

Copyright © 2017