Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
On Mon, 31 Aug 2020 15:30:34 -0000 (UTC)
Recliner wrote: wrote: On Mon, 31 Aug 2020 10:40:03 +0100 Graeme Wall wrote: On 31/08/2020 09:46, wrote: On Sun, 30 Aug 2020 23:48:23 +0100 Basil Jet wrote: https://www.hamhigh.co.uk/news/herit...ould-be-demoli shed-1-6733534 Never mind demolishing it - they should reinstate the line to muswell hill. All the trackbed is still in situ from there back to highgate sidings and putting track back down and restoring highgate high level station would cost buttons in comparisons to white elephants such as crossrail. I'm pretty sure a shuttle service to and from highgate to catch the main northern line would be pretty popular given the current alternative is the bus to wood green. So a couple of hundred, at most, commuters a day compared to the white elephant carrying tens of thousands. A couple of hundred? You've never been to muswell hill have you. And crossrail sure as hell won't be carrying 10s of thousands anytime soon even if it does open next year which it probably won't. It definitely won't open in 2021, and won't fully open till at least 2023. This is beyond incompetant management and unrealistic tendering timescales. I wonder if there's been some active sabotage, supplies theft or some other criminal activities going on down at site level that they don't want the public to know about. These are huge sites and even with Covid workers should be able to socially distance quite adequately to get on with the job. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Park Avenue, NW2 | London Transport | |||
Fwd: Planets Gather on May 5 and May 17, 2000 | London Transport | |||
Extend the ELL to Alexandra Palace? | London Transport | |||
Whitton Avenue East / West | London Transport |